Show simple item record

dc.contributor.advisorAvalos Ortecho, Edilberto Miguel
dc.contributor.authorOcharan Rojas, Diego Andreé
dc.contributor.authorPortillo Saldaña, Claudia Isabel
dc.date.accessioned2022-04-21T19:34:14Z
dc.date.available2022-04-21T19:34:14Z
dc.date.issued2022
dc.identifier.citationOcharan Rojas, D. A. y Portillo Saldaña, C. I. (2022). Estudio de prefactibilidad para la instalación de una planta productora de ladrillos de madera plástica [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/15646es_PE
dc.identifier.urihttps://hdl.handle.net/20.500.12724/15646
dc.description.abstractEl presente trabajo de investigación tiene como objetivo principal determinar la factibilidad económica, financiera y socialmente de implementar una planta productora de ladrillos de madera plástica. La justificación de la investigación se centra en que actualmente no existen sistemas para gestionar eficientemente los residuos generados por la población, los cuales incrementan la contaminación de suelos y mares. Es por ello que, se propone utilizar plástico reciclado y residuos de madera para fabricar ladrillos de madera plástica. La metodología utilizada es descriptiva – exploratoria, ya que se revisaron diversos estudios de investigación publicados sobre las cualidades del material propuesto. Asimismo, se pudo determinar que la localización más adecuada de la planta es en la zona industrial del distrito de Villa el Salvador en Lima Metropolitana. La planta productora tiene una capacidad de 10 809 463 ladrillos al año y la tecnología a utilizar será semi automática ya que requiere supervisión por parte de los operarios. La inversión total del proyecto es de S/ 5 296 916.82 de los cuales el 60% es financiado por los accionistas y lo restaste será financiado por medio de un préstamo bancario en el Banco Continental que ofrece una tasa efectiva anual de 12.70%. Por último, se realizaron las evaluaciones económicas y financieras, las cuales afirman que el proyecto es viable ya que se obtuvo un valor actual neto financiero de S/3 603 465.41 y una tasa interna de retorno de 48.89%, con un periodo de recupero de 2 años y 11 meses. Asimismo, el proyecto generará 76 nuevos puestos de trabajo con una densidad de capital de S/ 69 696.27. Por todo lo mencionado anteriormente, se puede concluir que el proyecto es viable económica, financiera y socialmente.es_PE
dc.description.abstractThe main objective of this research work is to determine the economic, financial and social feasibility of implement a production plant of plastic wood bricks. The justification of the research focuses on the fact that currently there are no efficientive systems to manage the garbage generated by the population, which increases the pollution of soils and seas. For this reason, it is proposed to use recycled plastic and wood to make plastic wood bricks. The methodology used is descriptive - exploratory because various published research studies of the qualities of the proposed material were reviewed. Furthermore, it was determined that the most suitable location for the plant is in the industrial zone of the Villa el Salvador district in Metropolitan Lima. The production plant has a capacity of 10 809 463 bricks per year and the technology to be used will be semi-automatic since it requires supervision by the operators. The total investment of the project is S/ 5 296 916.82 of which 60% is financed by the shareholders and the remainder will be financed by a bank loan in the Banco Continental that offers an effective annual rate of 12.7%. Finally, the economic and financial analysis were carried out, which affirm that the project is viable because it has a net present value of S/ 3 603 465.41 and an internal rate of return of 48.89%, with a payback period of 2 years and 11 months. In addition of that, the project will generate 76 new jobs with a capital density of S/ 69 696.27. For all the mention before, it can be concluded that the project is economically, financially, and socially viable.en_EN
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad de Limaes_PE
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/4.0/*
dc.sourceRepositorio Institucional - Ulimaes_PE
dc.sourceUniversidad de Limaes_PE
dc.subjectLadrilloses_PE
dc.subjectMaderaes_PE
dc.subjectRecicladoes_PE
dc.subjectMateriales de construcciónes_PE
dc.subjectPlásticoses_PE
dc.subjectBrickses_PE
dc.subjectWoodes_PE
dc.subjectRecyclinges_PE
dc.subjectBuilding materialses_PE
dc.subjectPlasticses_PE
dc.subjectEstudios de prefactibilidades_PE
dc.subjectProyectos industrialeses_PE
dc.subjectPrefeasibility studieses_PE
dc.subjectIndustrial projectses_PE
dc.subject.classificationIngeniería industrial / Producciónes_PE
dc.titleEstudio de prefactibilidad para la instalación de una planta productora de ladrillos de madera plásticaes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesis
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.grantorUniversidad de Lima. Facultad de Ingeniería y Arquitecturaes_PE
thesis.degree.levelTítulo profesionales_PE
thesis.degree.nameIngeniero Industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04
renati.author.dni70212312
renati.author.dni71079154
renati.advisor.orcidhttps://orcid.org/0000-0003-0939-634X
renati.advisor.dni17896955
renati.jurorSalazar Medina, Nicolás Francisco
renati.jurorArroyo Gordillo, Pedro Antonio
renati.jurorMalaga Ortiz, Maria Teresa
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesional
renati.typehttps://purl.org/pe-repo/renati/type#tesis
renati.discipline722026
dc.identifier.isni0000000121541816


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

info:eu-repo/semantics/openAccess
Except where otherwise noted, this item's license is described as info:eu-repo/semantics/openAccess