Mostrar el registro sencillo del ítem

dc.contributor.authorTuesta Schuler, Rodrigo
dc.contributor.authorVicuña Jimenez, Mark Anthony
dc.contributor.authorDel Savio, Alexandre Almeida
dc.contributor.authorPalpan, Alejandro
dc.contributor.authorQuiroz, Felipe
dc.contributor.authorValle, Erika
dc.contributor.otherDel Savio, Alexandre Almeida
dc.date.accessioned2023-10-12T16:51:36Z
dc.date.available2023-10-12T16:51:36Z
dc.date.issued2022
dc.identifier.citationRodrigo Tuesta, R., Vicuña, M., Del Savio, A. A., Palpan, A., Valle E. & Quiroz, F. (2022). Prefabricated Reinforcement in Construction Using VDC: Case Study Ovalo Monitor Bridge. In Proceedings of the 2022 30th Annual Conference of the International Group for Lean Construction, IGLC 2022, Edmonton, Canadá, July 2022, 1008-1019. https://doi.org/10.24928/2022/0210es_PE
dc.identifier.urihttps://hdl.handle.net/20.500.12724/19080
dc.description.abstractIn construction projects, there may be rework and delays associated with construction processes with a low level of industrialization, resulting from the lack of constructability of the designs. To promote industrialization and improve the project's constructability, we implemented the Virtual Design & Construction (VDC) methodology, combined with a system of prefabricated reinforcement cages (PRC) elements in constructing an 870-meter span bridge located in Lima, Peru. The objective was to reduce structural rebars' assembly times, replace the traditional on-site processes of cutting, bending, and assembling steel with an industrial process based on systems of PRC steel elements. As a result, the assembly times of the structural item were reduced by 31%, thanks to the use of PRC elements. In addition, due to the VDC methodology, a 100% buildable design of the PRC elements was achieved.es_PE
dc.formatapplication/htmles_PE
dc.language.isoenges_PE
dc.publisherThe International Group for Lean Constructiones_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.sourceRepositorio Institucional - Ulimaes_PE
dc.sourceUniversidad de Limaes_PE
dc.subjectPendientees_PE
dc.titlePrefabricated Reinforcement in Construction Using VDC: Case Study Ovalo Monitor Bridgees_PE
dc.typeinfo:eu-repo/semantics/conferenceObjectes_PE
dc.type.otherArtículo de conferencia en Scopuses_PE
dc.identifier.journal30th Annual Conference of the International Group for Lean Construction, IGLC 2022es_PE
dc.publisher.countryCAes_PE
dc.description.peer-reviewRevisión por pareses_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.00es_PE
dc.identifier.doihttps://doi.org/10.24928/2022/0210
dc.type.versioninfo:eu-repo/semantics/publishedVersiones_PE
dc.contributor.studentTuesta Schuler, Rodrigo (Ingeniería Civil)
dc.contributor.studentVicuña Jimenez, Mark Anthony (Ingeniería Civil)
ulima.catOI
ulima.autor.afiliacionDel Savio, Alexandre Almeida (Civil Engineering Department, Universidad de Lima)es_PE
ulima.autor.afiliacionTuesta Schuler, Rodrigo (Civil Engineering Department, Universidad de Lima)es_PE
ulima.autor.afiliacionVicuña Jimenez, Mark Anthony (Civil Engineering Department, Universidad de Lima)es_PE
ulima.autor.carreraDel Savio, Alexandre Almeida (Ingeniería Civil)es_PE


Ficheros en el ítem

FicherosTamañoFormatoVer

No hay ficheros asociados a este ítem.

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess