• español
    • English
  • Policies
  • English 
    • español
    • English
  • Login
View Item 
  •   Repositorio Institucional ULima
  • Artículos científicos
  • Ingeniería Industrial
  • View Item
  •   Repositorio Institucional ULima
  • Artículos científicos
  • Ingeniería Industrial
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Design of variance control charts with estimated parameters: A head to head comparison between two perspectives

Thumbnail
Date
2022
Author(s)
Cornejo Sarmiento, Martín Guillermo
Jardim, Felipe Schoemer
Chakraborti, Subhabrata
Epprecht, Eugenio Kahn
Metadata
Show full item record
Abstract
Since parameter estimation degrades chart performance, it is important to design a control chart correctly, that is, taking account of the estimation effects. To this end, two perspectives are available in the literature: the unconditional, which focuses on the unconditional in-control (IC) average run length ((Formula presented.)), and the conditional, which focuses on the IC run-length distribution conditioned on the parameter estimates and the exceedance probability criterion (EPC). Much of the literature on this topic is in the context of monitoring the mean. However, monitoring the variance is important in the larger monitoring context, not only per se, but also because a reliable and stable estimate of the process variance is required in the first place for setting up the control chart for the mean. With this in mind, and given that a recent paper studied the design of the (Formula presented.) chart, here we consider the S 2 chart and examine the effects of each perspective on the design and IC performance. To this end, we first compare the required number of Phase I samples and the control limit adjustments in two cases: the upper one-sided chart and the equal-tailed two-sided chart. Second, we examine the performance of each chart, designed according to one perspective, under the other perspective. Results show major differences in the impact and consequences of the adopted chart design perspective on chart performance. An illustration with a real dataset is provided. Finally, an overall summary and some conclusions are presented.
URI
https://hdl.handle.net/20.500.12724/11992
DOI
https://doi.org/10.1080/00224065.2020.1834892
How to cite
Sarmiento, M. G. C., Jardim, F. S., Chakraborti, S. & Epprecht, E.K. (2022). Design of variance control charts with estimated parameters: A head to head comparison between two perspectives. Journal of Quality Technology, 54(3), 249-268. https://doi.org/10.1080/00224065.2020.1834892
Publisher
Taylor and Francis Ltd.
Area / Line of research
Productividad y empleo / Innovación: tecnologías y productos
Category / Subcategory
Ingeniería industrial / Teoría
Subject
Estimación estadística
Análisis de varianza
Statistical estimation
Analysis of variance
Journal
Journal of Quality Technology
Note
Indexado en Scopus
Collections
  • Ingeniería Industrial [139]


Contacto: repositorio@ulima.edu.pe

Todos los derechos reservados. Diseñado por Chimera Software
 

 

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsAdvisorsAuthors UlimaArea / Line of researchCategory / SubcategoryDocument typeThis CollectionBy Issue DateAuthorsTitlesSubjectsAdvisorsAuthors UlimaArea / Line of researchCategory / SubcategoryDocument type

My Account

LoginRegister

Statistics

View Usage Statistics

Contacto: repositorio@ulima.edu.pe

Todos los derechos reservados. Diseñado por Chimera Software