Mostrar el registro sencillo del ítem

dc.contributor.advisorValencia Amado, Miguel Ángel
dc.contributor.authorSerna Kam, Freddy Alexander
dc.date.accessioned2021-01-22T00:11:15Z
dc.date.available2021-01-22T00:11:15Z
dc.date.issued2018
dc.identifier.citationSerna-Kam, F. A. (2018). Sistema de Tareo - Cappazo [Trabajo de suficiencia profesional para optar el Título Profesional de Ingeniero de Sistemas, Universidad de Lima]. Repositorio Institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/12353es_PE
dc.identifier.urihttps://hdl.handle.net/20.500.12724/12353
dc.description.abstractEn las empresas del rubro de la construcción la mano de obra representa entre el 30% y 40% del costo total de la obra. La empresa líder en este rubro en el Perú gestionaba la mano de obra mediante un flujo de trabajo manual, con muchas actividades operativas, sujeto a errores, sin trazabilidad y sin poder realizar un seguimiento del proceso. Se hacía uso de un formato en papel para el registro y aprobación de las horas hombre (a este registro se le conoce como tareo), se realizaban múltiples verificaciones y controles en paralelo para completar el proceso, el cual terminaba con el pago de planillas. Dada la importancia de este proceso, se decidió desarrollar un sistema de información que mediante una aplicación para dispositivos móviles y una aplicación web, permite la digitalización del registro y aprobación de horas hombre trabajadas en las obras. De este modo los capataces pueden registrar diariamente en sus dispositivos móviles los tareos y asignar el correspondiente centro de costo; luego esta información es revisada y aprobada mediante la aplicación web por los ingenieros y administradores de la obra. Con este sistema de información se logró mejorar la gestión y control de la mano de obra contando con información confiable y oportuna para la correcta toma de decisiones. Este proyecto se desarrolló utilizando metodologías ágiles, logrando luego de 04 meses de desarrollo desplegar el Mínimo Producto Viable (MVP, del inglés Mínimum Viable Product) en una obra ejecutada en Lima obteniendo gran aceptación por parte de los usuarios finales. Un factor importante en el éxito del proyecto fue reunir a un equipo multidisciplinario (especialistas de negocio, especialistas de desarrollo de software) que comprendían el marco de trabajo Scrum logrando entregas tempranas de software y retroalimentación de los usuarios finales para asegurar el desarrollo de un producto que genere valor.es_PE
dc.description.abstractIn construction companies, labor represents between 30% and 40% of the total cost of the work. The leading company in this area in Peru managed the workforce through a manual workflow, with many operational activities, subject to errors, without traceability and without being able to track the process. A paper format was used for the registration and approval of man hours (this record is known as task), multiple verifications and controls were carried out in parallel to complete the process, which ended with the payment of payroll. Given the importance of this process, it was decided to develop an information system that, through an application for mobile devices and a web application, allows the digitization of the registration and approval of man-hours worked on the works. In this way, foremen can record daily tasks on their mobile devices and assign the corresponding cost center; then this information is reviewed and approved through the web application by the engineers and administrators of the work. With this information system, it was possible to improve the management and control of the workforce, counting on reliable and timely information for correct decision-making. This project was developed using agile methodologies, achieving after 04 months of development to deploy the Minimum Viable Product (MVP, from the English Minimum Viable Product) in a work carried out in Lima, obtaining great acceptance by end users. An important factor in the success of the project was bringing together a multidisciplinary team (business specialists, software development specialists) who understood the Scrum framework achieving early delivery of software and feedback from end users to ensure the development of a product. that generates value.es_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad de Limaes_PE
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/*
dc.sourceRepositorio Institucional - Ulimaes_PE
dc.sourceUniversidad de Limaes_PE
dc.subjectSistemas de informaciónes_PE
dc.subjectComputación en la nubees_PE
dc.subjectJornada de trabajoes_PE
dc.subjectTrabajadores de la construcciónes_PE
dc.subjectInformation systemses_PE
dc.subjectCloud computinges_PE
dc.subjectHours of labores_PE
dc.subjectBuilding trades-Employeeses_PE
dc.subject.classificationIngeniería de sistemas / Sistemas de informaciónes_PE
dc.titleSistema de Tareo - Cappazoes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesis
thesis.degree.disciplineIngeniería de Sistemases_PE
thesis.degree.grantorUniversidad de Lima. Facultad de Ingeniería y Arquitecturaes_PE
thesis.degree.levelTitulo profesionales_PE
thesis.degree.nameIngeniero de Sistemases_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.02.04
renati.author.dni40215922
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesional
renati.typehttps://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional
renati.discipline612076


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess