Show simple item record

dc.contributor.advisorMendoza Mendoza, Carlos Héctor
dc.contributor.authorBenites Guevara, Luis Miguel
dc.contributor.authorEstrella Borja, Cesar Adolfo
dc.date.accessioned2021-08-10T14:53:23Z
dc.date.available2021-08-10T14:53:23Z
dc.date.issued2021
dc.identifier.citationBenites Guevara, L. M. y Estrella Borja, C. A. (2021). Propuesta de mejora en la empresa Importaciones Halley S.A.C. con la implementación de una nueva línea de producción [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima.es_PE
dc.identifier.urihttps://hdl.handle.net/20.500.12724/13770
dc.description.abstractEl presente estudio tiene como finalidad demostrar que es factible la instalación de una línea de producción de pipas para motos de dos tiempos y su protector. A continuación, se dará un resumen con los principales resultados sobre los cuales se demuestra que el proyecto es viable tanto económica, técnica y ambientalmente. El mercado que se busca abastecer serán los usuarios de motocicletas que participan en competencias que residan en Lima Metropolitana pertenecientes a los niveles socioeconómicos A y B entre 18 y 55 años. Como resultado se obtuvo que la empresa cuenta con la maquinaria, la infraestructura, conocimiento y canales de distribución que necesita la nueva línea de producción, esto representa la factibilidad de la puesta en marcha del proyecto y traería beneficios económicos para la compañía, de tal modo que el proceso de fabricación presente un menor costo a los que se ofrecen actualmente y que el producto sea competitivo con una calidad óptima. El impacto medioambiental es evaluado mediante el uso de la matriz de Leopold siendo considerado como de un impacto bajo al medio ambiente luego de su respectiva interpretación. Finalmente, se evaluó financieramente el proyecto, que será asumido con capital propio, obteniendo resultados positivos para la línea y empresa como un VAN de S/57,740.76 y un TIR de 718.6 % y solo representa una inversión de S/2,108.98, siendo esta recuperada en 1.68 meses y con una relación beneficio/costo de 2.35 en el primer año de implementación.es_PE
dc.description.abstractThe purpose of this study is to demonstrate that it is feasible to install a pipe production line for two-stroke motorcycles and its protector. Next, a summary will be given with the main results on which it is shown that the project is economically, technically and environmentally viable. The market to be supplied will be motorcycle users participating in competitions residing in Metropolitan Lima belonging to socioeconomic levels A and B between 18 and 55 years old. As a result, it was obtained that the company has the machinery, infrastructure, knowledge and distribution channels that the new production line needs, this represents the feasibility of starting the project and would bring economic benefits for the company, in such a way that the manufacturing process presents a lower cost than those currently offered and that the product is competitive with an optimal quality. The environmental impact is evaluated through the use of the Leopold matrix, being considered as having a low impact on the environment after its respective interpretation. Finally, the project was financially evaluated, which will be assumed with its own capital, obtaining positive results for the line and the company as a NPV of S / 57,540.76 and an IRR of 718.6% and only represents an investment of S / 2,108.98, being recovered in 1.68 months and with a benefit / cost ratio of 2.35 in the first year of implementation.en_EN
dc.formatapplication/pdf
dc.language.isospa
dc.publisherUniversidad de Lima
dc.rightsinfo:eu-repo/semantics/openAccess*
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/4.0/*
dc.sourceRepositorio Institucional Ulima
dc.sourceUniversidad de Lima
dc.subjectMotocicletas de carrerases_PE
dc.subjectSistemas de escapees_PE
dc.subjectIndustria de suministros para automóvileses_PE
dc.subjectEstudios de prefactibilidades_PE
dc.subjectRacing motorcyclesen_EN
dc.subjectExhaust systemsen_EN
dc.subjectAutomotive supply industryen_EN
dc.subjectPrefeasibility studiesen_EN
dc.subject.classificationIngeniería industrial / Ingeniería de Negocioses_PE
dc.titlePropuesta de mejora en la empresa Importaciones Halley S.A.C. con la implementación de una nueva línea de producciónes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesis
thesis.degree.disciplineIngeniería Industrial
thesis.degree.grantorUniversidad de Lima. Facultad de Ingeniería y Arquitectura
thesis.degree.levelTítulo profesional
dc.type.otherTesis
thesis.degree.nameIngeniero Industrial
dc.publisher.countryPE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04
renati.author.dni73093186
renati.author.dni70081260
renati.advisor.orcidhttps://orcid.org/0000-0001-6751-9454
renati.advisor.dni06708934
renati.jurorSotomayor Cabrera, Arístides
renati.jurorCorzo Chávez, Jorge
renati.jurorIngar Cangalaya, Araken
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesional*
renati.typehttps://purl.org/pe-repo/renati/type#tesis*
renati.discipline722026
dc.identifier.isni121541816


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

info:eu-repo/semantics/openAccess
Except where otherwise noted, this item's license is described as info:eu-repo/semantics/openAccess