Estudio de prefactibilidad para la instalación de una planta de producción de cargadores de celulares ecológicos que utilizan la energía generada por el uso de bicicletas
dc.contributor.advisor | Espinoza Matos, José Francisco | |
dc.contributor.author | Briceño Campos, Andres Omar | |
dc.date.accessioned | 2021-12-14T03:07:18Z | |
dc.date.available | 2021-12-14T03:07:18Z | |
dc.date.issued | 2021 | |
dc.identifier.citation | Briceño Campos, A. O. (2021). Estudio de prefactibilidad para la instalación de una planta de producción de cargadores de celulares ecológicos que utilizan la energía generada por el uso de bicicletas [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/14700 | es_PE |
dc.identifier.uri | https://hdl.handle.net/20.500.12724/14700 | |
dc.description.abstract | El presente trabajo busca demostrar la viabilidad técnica, económica, social y de mercado de la instalación de una planta ensambladora de cargadores de celular para bicicleta durante los años del 2022 al 2026. En el capítulo I se presentan los aspectos generales de la investigación, entre ellos la problemática actual, los objetivos y la justificación del proyecto. Asimismo, en el capítulo II se abordan las características del producto y del sector en el que este se desarrolla. Además, se analiza la intensidad e intención de compra, obteniéndose una demanda del producto para el 2022 de 123 125 unidades. En el capítulo III se selecciona la mejor alternativa para la ubicación de la planta tanto a nivel macro como micro. A nivel macro, la opción seleccionada fue Lima debido a su facilidad de importación y a que tiene una mayor cantidad de público objetivo. Por otro lado, a nivel micro, se seleccionó Lurín tomando como factores: costo de terreno, seguridad ciudadana, políticas municipales, disponibilidad de terreno y la cercanía al cliente. Respecto a la cantidad de máquinas, equipos y mano de obra a necesitar, estos se aprecian mediante las evaluaciones del capítulo IV y V, obteniéndose un área de 650 metros cuadrados. En el capítulo VI se observa la organización de la empresa, desde el organigrama hasta la estructura como sociedad. Adicionalmente, se han descrito también los puestos propuestos a nivel de sus funciones. Asimismo, en el capítulo VII se analiza la inversión que requiere el proyecto, así como también los estados financieros y económicos. Se concluyó que el proyecto es económicamente rentable. Por último, en el capítulo VIII se evalúa el impacto social de la empresa, en el cual se evidencia el beneficio que genera el desarrollo de este proyecto en la comunidad. | es_PE |
dc.description.abstract | The present study seeks to demonstrate the technical, economic, social and market viability of the installation of an assembly plant for cell phone chargers for bicycle during the years 2022 to 2026. Chapter I presents the general aspects of the research, including the current problems, the objectives and the justification of the project. Likewise, chapter II addresses the characteristics of the product and the sector in which it is developed. In addition, the intensity and purchase intention are analyzed, obtaining a demand for the product for 2022 of 246 250 units. Chapter III selects the best alternative for the location of the plant both at the macro and micro level. At the macro level, the option selected was Lima due to its ease of importation and the fact that it has a larger target audience. On the other hand, at the micro level, Lurín was selected taking as factors: cost of land, citizen security, municipal policies, availability of land and proximity to the client Regarding the number of machines, equipment and labor to be needed, these are appreciated through the evaluations of Chapter IV and V, obtaining an area of 650 square meters. In chapter VI the organization of the company is observed, from the organization chart to the structure as a society. Additionally, the positions proposed at the level of their functions have also been described. Further, Chapter VII analyzes the investment required by the project, as well as the financial and economic statements. It was concluded that the project is economically profitable. Finally, in chapter VIII the social impact of the company is evaluated, which shows the benefit generated by the development of this project in the community. | en_EN |
dc.format | application/pdf | |
dc.language.iso | spa | |
dc.publisher | Universidad de Lima | |
dc.rights | info:eu-repo/semantics/openAccess | * |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/4.0/ | * |
dc.source | Repositorio Institucional Ulima | |
dc.source | Universidad de Lima | |
dc.subject | Recursos energéticos renovables | es_PE |
dc.subject | Cargadores de bateria | es_PE |
dc.subject | Teléfonos inteligentes | es_PE |
dc.subject | Bicicletas | es_PE |
dc.subject | Proyectos industriales | es_PE |
dc.subject | Estudios de factibilidad | es_PE |
dc.subject | Renewable energy resources | en_EN |
dc.subject | Battery chargers | en_EN |
dc.subject | Smartphones | en_EN |
dc.subject | Bicycles | en_EN |
dc.subject | Industrial development projects | en_EN |
dc.subject | Feasibility studies | en_EN |
dc.subject.classification | Ingeniería industrial / Diseño e Innovación Tecnológica | es_PE |
dc.title | Estudio de prefactibilidad para la instalación de una planta de producción de cargadores de celulares ecológicos que utilizan la energía generada por el uso de bicicletas | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | |
thesis.degree.discipline | Ingeniería Industrial | |
thesis.degree.grantor | Universidad de Lima. Facultad de Ingeniería y Arquitectura | |
thesis.degree.level | Título profesional | |
dc.type.other | Tesis | |
thesis.degree.name | Ingeniero Industrial | |
dc.publisher.country | PE | |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.11.04 | |
renati.author.dni | 75447190 | |
renati.advisor.orcid | https://orcid.org/0000-0001-8804-5622 | |
renati.advisor.dni | 40152366 | |
renati.juror | Vidal Paredes, Alex Antonio | |
renati.juror | Almandoz Núñez, Ana María | |
renati.juror | Villalobos Sousa, Cesar Rodia | |
renati.level | http://purl.org/pe-repo/renati/level#tituloProfesional | * |
renati.type | https://purl.org/pe-repo/renati/type#tesis | * |
renati.discipline | 722026 | |
dc.identifier.isni | 121541816 |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Tesis [887]