Mostrar el registro sencillo del ítem

dc.contributor.advisorLizárraga Portugal, Carlos Augusto
dc.contributor.authorCardenas Garcia, Juan Daniel
dc.contributor.authorRebaza Santa Cruz, Jhonatan Jesus
dc.date.accessioned2021-12-14T11:02:45Z
dc.date.available2021-12-14T11:02:45Z
dc.date.issued2021
dc.identifier.citationCardenas Garcia, J. D. y Rebaza Santa Cruz, J. J. (2021). Mejora en el área de operaciones de la empresa T.C.G S.A.C. a partir de un nuevo sistema de gestión logística [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/14719es_PE
dc.identifier.urihttps://hdl.handle.net/20.500.12724/14719
dc.description.abstractEl presente trabajo de investigación consiste en la mejora del área de operaciones a partir de la implementación de un nuevo sistema de gestión logística en la empresa TERRAMAQ CONTRATISTAS GENERALES S.A.C con el objetivo de reducir los elevados costos logísticos y el retraso en avance de la obra de saneamiento ejecutada en el distrito Ocucaje en el departamento de Ica. Se demostró una reducción total del 11,67% del tiempo promedio de retraso en avance de obra, es decir de 14 a 0 días, lo que genera un impacto de S/ 90 679 de ahorro. Por otro lado, se obtuvo otra reducción total en el costo logístico adicional al presupuestado del 5,68%, mismo que genera un impacto de S/ 46 019 de ahorro. Más adelante, se encontró la causa raíz que resultó ser la mala gestión de compras, por lo que se propusieron alternativas de solución resultando la indicada para hacer la mejora la implementación de un sistema de gestión de compras programadas. En primer lugar, mediante el método de clasificación de materiales ABC, se descubrió que los denominados “Materiales tipo A” (tubos de 250, 200 y 160mm; bolsas de cemento; y kits de caja y tapa de desagüe) son los principales para hacer el diagnóstico de gestión logística. Posteriormente, y a partir de la implementación de la mejora basándose en compras programadas mediante el Plan de Compras MRP, se realizó simulaciones en el software Arena para los materiales tipo A con el objetivo de comparar el escenario actual con el implementando tras la mejora (reducción a 0 de los indicadores), demostrando de esa forma la viabilidad técnica de la mejora. Seguidamente, se comprobó la viabilidad económica mediante la comparación de los distintos indicadores resultantes del estado mejorado y actual: VAN (S/ 576 275 Vs S/ 289 190), TIR (119% Vs 41%), Beneficio Costo (4,35 Vs 1,88) y Periodo de Recupero (21 días Vs 41 días), tomando una inversión inicial (S/ 171 817 Vs S/ 330 000) y diversos ingresos y gastos involucrados. Finalmente, se recurrió a la construcción de indicadores sociales como Valor agregado (S/ 1 548 602,21), relación producto capital (9,01), productividad de mano de obra, intensidad de capital (0,11), y densidad de capital (S/ 4 909,05 para todos los meses) demostrando de esta forma que el proyecto también es viable socialmente.es_PE
dc.description.abstractThis research work consists of improving the operations area from the implementation of a new logistics management system in the company TERRAMAQ CONTRATISTAS GENERALES SAC with the aim of reducing the high logistics costs and the delay in progress of sanitation construction carried out in the Ocucaje district in the department of Ica. It was shown a total reduction of 11.67% of the average delay time in progress of the construction, that is from 14 to 0 days, which generates an impact of S/ 90 679 in savings. On the other hand, another total reduction in the logistics cost in addition to the budget of 5,68% is obtained, which generates an impact of S / 46 019 of savings for the company. Later, the root cause was found, which turned out to be poor purchase management, so alternative solutions were proposed, resulting in the right one to improve the implementation of a programmed purchase management system. In the first place, by the ABC materials classification method, it was discovered that the so-called "Type A materials" (250, 200 and 160mm tubes; cement bags; and box and cover drain kits) are the main ones to do the diagnosis of logistics management. Subsequently, and from the implementation of the improvement based on programmed purchases through the MRP Purchasing Plan, simulations were carried out in the Arena software for type A materials in order to compare the current scenario with the implemented one after the improvement (reduction to 0 of the indicators), thus demonstrating the technical feasibility of the improvement. Next, the economic viability was verified by comparing the different indicators resulting from the improved and current state: NPV (S/ 576 275 Vs S/ 289 190), IRR (119% Vs 41%), Cost Benefit (4,35 Vs 1,88) and Recovery Period (21 days Vs 41 days), taking an initial investment (S/ 171 817 Vs S /330 000) and various income and expenses involved. Finally, the construction of social indicators such as added value (S/ 1 548 602,21), capital product ratio (9,01), labor productivity, capital intensity (0,11), and capital density (S / 4 909,05 for all months) were used thus demonstrating that the project is also socially viable.en_EN
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad de Limaes_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/4.0/*
dc.sourceRepositorio Institucional - Ulimaes_PE
dc.sourceUniversidad de Limaes_PE
dc.subjectLogística empresariales_PE
dc.subjectIngeniería de procesoses_PE
dc.subjectProceso de mejora continuaes_PE
dc.subjectBusiness Logisticsen_EN
dc.subjectProcess engineeringen_EN
dc.subjectContinuous improvement processen_EN
dc.subject.classificationIngeniería industrial / Producción y Logísticaes_PE
dc.titleMejora en el área de operaciones de la empresa T.C.G S.A.C. a partir de un nuevo sistema de gestión logísticaes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.grantorUniversidad de Lima. Facultad de Ingeniería y Arquitecturaes_PE
thesis.degree.levelTítulo profesionales_PE
thesis.degree.nameIngeniero Industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_PE
renati.author.dni71208556
renati.author.dni76481724
renati.advisor.orcidhttps://orcid.org/0000-0002-7057-4099es_PE
renati.advisor.dni43691352
renati.jurorParedes Larroca, Fabricio Humberto
renati.jurorGálvez Zárate, Carlos Alberto
renati.jurorReaño Vera, Abel Antonio Martin
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
renati.discipline722026es_PE


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess