dc.contributor.advisor | Salinas Pedemonte, Pedro Arturo | |
dc.contributor.author | Campos Venegas, Juan Carlos | |
dc.contributor.author | Muñoz Garcia, Pedro Alonso | |
dc.date.accessioned | 2022-02-02T19:25:44Z | |
dc.date.available | 2022-02-02T19:25:44Z | |
dc.date.issued | 2021 | |
dc.identifier.citation | Campos Venegas, J. C. y Muñoz Garcia, P. A. (2021). Estudio de prefactibilidad para la instalación de una planta productora de cable de cobre recubierto con PVC (Building Wire) [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/15027 | es_PE |
dc.identifier.uri | https://hdl.handle.net/20.500.12724/15027 | |
dc.description.abstract | El presente estudio surge producto del interés por promover la transformación de materias
primas minerales, principal componente del PBI del Perú, como lo es el cobre.
Por lo que este proyecto desarrollará en los primeros capítulos los aspectos
generales que debe tener el producto y los estudios a revisar para tener un sustento teórico
adecuado. Además de un estudio de mercado y localización para la implementación de
una planta de producción de cables de cobre recubiertos con PVC (Building Wire).
Obteniendo que se tendrá una demanda de 3.2 millones de rollos de cable de 100 metros
para una planta ubicada en Lurín. Seguido por el cálculo del tamaño de planta
identificando al tamaño materia prima como el limitante para la continuidad del proyecto.
Asimismo, la investigación revisa a fondo los procesos de producción desde la
fundición del cobre para la producción del cable de cobre para obtener un producto de
calidad que cumpla con los estándares internacionales. Luego de ello, se definirá la
estructura administrativa de la empresa del proyecto revisando los puestos adecuados de
trabajo.
Finalmente se realizará un análisis económico y financiero obteniendo un VAN
y TIR financiero de S/ 52 777 721 y 29.15% respectivamente, Beneficio Costo de 2.198
y Periodo de Recupero de 8 años para los 20 años de vida útil del proyecto. Estos
indicadores se complementan con un análisis de sensibilidad que involucra directamente
el precio del cobre y de indicadores sociales. | es_PE |
dc.description.abstract | This study arises because of the interest in promoting the transformation of mineral raw
materials, the main component of Peru's GDP, such as copper.
This project will develop in the first chapters the general aspects that the product
must have and the studies to review to have an adequate theoretical support. In addition
to this, a market and location study for the implementation of a production plant for
copper cables coated with PVC (Building Wire). Obtaining that there will be a demand
for 3.2 million rolls of 100-meter cable for a plant located in Lurín. Followed by the
calculation of the plant size, identifying the raw material size as the limitation for the
continuity of the project.
Furthermore, the research thoroughly reviews production processes from copper
melting to copper wire production to obtain a quality product that reaches international
standards. After that, the administrative structure of the project company will be defined
by reviewing the appropriate job positions.
Finally, an economic and financial analysis will be performed, obtaining a
financial NPV and IRR of S/ 52 777 721 and 29.15% respectively, Cost Benefit of 2.198
and Recovery Period of 8 years for the 20-year life of the project. These indicators are
complemented by a sensitivity analysis that directly involves the price of copper and
social indicators. | en_EN |
dc.format | application/pdf | |
dc.language.iso | spa | |
dc.publisher | Universidad de Lima | |
dc.rights | info:eu-repo/semantics/openAccess | * |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/4.0/ | * |
dc.source | Repositorio Institucional Ulima | |
dc.source | Universidad de Lima | |
dc.subject | Wire rope | en_EN |
dc.subject | Copper | en_EN |
dc.subject | Polyvinyl chloride | en_EN |
dc.subject | Industrial projects | en_EN |
dc.subject | Feasibility studies | en_EN |
dc.subject | Cables metálicos | es_PE |
dc.subject | Cobre | es_PE |
dc.subject | Policloruro de vinilo | es_PE |
dc.subject | Proyectos industriales | es_PE |
dc.subject | Estudios de factibilidad | es_PE |
dc.subject.classification | Ingeniería industrial / Producción | es_PE |
dc.title | Estudio de prefactibilidad para la instalación de una planta productora de cable de cobre recubierto con PVC (Building Wire) | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | |
thesis.degree.discipline | Ingeniería Industrial | |
thesis.degree.grantor | Universidad de Lima. Facultad de Ingeniería y Arquitectura | |
thesis.degree.level | Título Profesional | |
dc.type.other | Tesis | |
thesis.degree.name | Ingeniero Industrial | |
dc.publisher.country | PE | |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.11.04 | |
renati.author.dni | 73200199 | |
renati.author.dni | 75972700 | |
renati.advisor.orcid | https://orcid.org/0000-0002-7021-1546 | |
renati.advisor.dni | 9138597 | |
renati.juror | Arroyo Benites, Edmundo Valdemar | |
renati.juror | Flores Pérez, Alberto Enrique | |
renati.juror | Ugarte Gomez, José Luis | |
renati.level | http://purl.org/pe-repo/renati/level#tituloProfesional | * |
renati.type | https://purl.org/pe-repo/renati/type#tesis | * |
renati.discipline | 722026 | |
ulima.cat | OI | |
dc.identifier.isni | 121541816 | |