Mostrar el registro sencillo del ítem
Estudio de prefactibilidad para la instalación de una planta productora de cable de cobre recubierto con PVC (Building Wire)
dc.contributor.advisor | Salinas Pedemonte, Pedro Arturo | |
dc.contributor.author | Campos Venegas, Juan Carlos | |
dc.contributor.author | Muñoz Garcia, Pedro Alonso | |
dc.date.accessioned | 2022-02-02T19:25:44Z | |
dc.date.available | 2022-02-02T19:25:44Z | |
dc.date.issued | 2021 | |
dc.identifier.citation | Campos Venegas, J. C. y Muñoz Garcia, P. A. (2021). Estudio de prefactibilidad para la instalación de una planta productora de cable de cobre recubierto con PVC (Building Wire) [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/15027 | es_PE |
dc.identifier.uri | https://hdl.handle.net/20.500.12724/15027 | |
dc.description.abstract | El presente estudio surge producto del interés por promover la transformación de materias primas minerales, principal componente del PBI del Perú, como lo es el cobre. Por lo que este proyecto desarrollará en los primeros capítulos los aspectos generales que debe tener el producto y los estudios a revisar para tener un sustento teórico adecuado. Además de un estudio de mercado y localización para la implementación de una planta de producción de cables de cobre recubiertos con PVC (Building Wire). Obteniendo que se tendrá una demanda de 3.2 millones de rollos de cable de 100 metros para una planta ubicada en Lurín. Seguido por el cálculo del tamaño de planta identificando al tamaño materia prima como el limitante para la continuidad del proyecto. Asimismo, la investigación revisa a fondo los procesos de producción desde la fundición del cobre para la producción del cable de cobre para obtener un producto de calidad que cumpla con los estándares internacionales. Luego de ello, se definirá la estructura administrativa de la empresa del proyecto revisando los puestos adecuados de trabajo. Finalmente se realizará un análisis económico y financiero obteniendo un VAN y TIR financiero de S/ 52 777 721 y 29.15% respectivamente, Beneficio Costo de 2.198 y Periodo de Recupero de 8 años para los 20 años de vida útil del proyecto. Estos indicadores se complementan con un análisis de sensibilidad que involucra directamente el precio del cobre y de indicadores sociales. | es_PE |
dc.description.abstract | This study arises because of the interest in promoting the transformation of mineral raw materials, the main component of Peru's GDP, such as copper. This project will develop in the first chapters the general aspects that the product must have and the studies to review to have an adequate theoretical support. In addition to this, a market and location study for the implementation of a production plant for copper cables coated with PVC (Building Wire). Obtaining that there will be a demand for 3.2 million rolls of 100-meter cable for a plant located in Lurín. Followed by the calculation of the plant size, identifying the raw material size as the limitation for the continuity of the project. Furthermore, the research thoroughly reviews production processes from copper melting to copper wire production to obtain a quality product that reaches international standards. After that, the administrative structure of the project company will be defined by reviewing the appropriate job positions. Finally, an economic and financial analysis will be performed, obtaining a financial NPV and IRR of S/ 52 777 721 and 29.15% respectively, Cost Benefit of 2.198 and Recovery Period of 8 years for the 20-year life of the project. These indicators are complemented by a sensitivity analysis that directly involves the price of copper and social indicators. | en_EN |
dc.format | application/pdf | |
dc.language.iso | spa | |
dc.publisher | Universidad de Lima | |
dc.rights | info:eu-repo/semantics/openAccess | * |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/4.0/ | * |
dc.source | Repositorio Institucional Ulima | |
dc.source | Universidad de Lima | |
dc.subject | Wire rope | en_EN |
dc.subject | Copper | en_EN |
dc.subject | Polyvinyl chloride | en_EN |
dc.subject | Industrial projects | en_EN |
dc.subject | Feasibility studies | en_EN |
dc.subject | Cables metálicos | es_PE |
dc.subject | Cobre | es_PE |
dc.subject | Policloruro de vinilo | es_PE |
dc.subject | Proyectos industriales | es_PE |
dc.subject | Estudios de factibilidad | es_PE |
dc.subject.classification | Ingeniería industrial / Producción | es_PE |
dc.title | Estudio de prefactibilidad para la instalación de una planta productora de cable de cobre recubierto con PVC (Building Wire) | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | |
thesis.degree.discipline | Ingeniería Industrial | |
thesis.degree.grantor | Universidad de Lima. Facultad de Ingeniería y Arquitectura | |
thesis.degree.level | Título Profesional | |
dc.type.other | Tesis | |
thesis.degree.name | Ingeniero Industrial | |
dc.publisher.country | PE | |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.11.04 | |
renati.author.dni | 73200199 | |
renati.author.dni | 75972700 | |
renati.advisor.orcid | https://orcid.org/0000-0002-7021-1546 | |
renati.advisor.dni | 9138597 | |
renati.juror | Arroyo Benites, Edmundo Valdemar | |
renati.juror | Flores Pérez, Alberto Enrique | |
renati.juror | Ugarte Gomez, José Luis | |
renati.level | http://purl.org/pe-repo/renati/level#tituloProfesional | * |
renati.type | https://purl.org/pe-repo/renati/type#tesis | * |
renati.discipline | 722026 | |
ulima.cat | OI | |
dc.identifier.isni | 121541816 |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Tesis [887]