dc.identifier.citationOrtega Diaz, A.G. (2022) Estudio de prefactibilidad para la instalación de una planta procesadora de cascos plegables elaborados de plástico reciclado HDPE [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/15973es_PE
dc.identifier.urihttps://hdl.handle.net/20.500.12724/15973
dc.description.abstractEl presente estudio evalúa la viabilidad comercial, técnica, económica, financiera y social de la instalación de una planta procesadora de cascos plegables elaborados de plástico reciclado HDPE. La demanda del proyecto en el año 5 es de 16 838 cascos en presentaciones de una caja. El público objetivo está conformado por las personas de 18 a 35 que pertenecen al NSE A y B con una captura de mercado de 46,1%. A la vez se estableció el precio unitario de S/ 105 puesto en tienda. Respecto a la localización de planta, esta se encuentra ubicada en Barranco en la provincia de Lima, principalmente por la cercanía a proveedores, precio de alquiler y cercanía a zonas con ciclovías, la cual fue determinada utilizando el método de ranking de factores. El proceso de producción consta de las etapas de triturado, peletizado, termoformado, ensamblado, troquelado, pintado, armado y empaquetado; siendo la materia prima el plástico reciclado HDPE. Así mismo, la planta tiene una capacidad instalada de 18 326, la cual fue definida por el armado que es el cuello de botella del proceso. El área total propuesta para la planta es 435 m2. El proyecto tendrá una inversión de 627 818 y presenta una estructura de financiamiento de 40% deuda y 60% aporte propio. La deuda será financiada por el banco Scotiabank por 05 años a una TEA de 11% para préstamos a medianas empresas a largo plazo. Por otro lado, se realiza la evaluación económica y financiera del proyecto. El flujo económico revela una TIR de 26,14% con un periodo de recupero de 4,29 años, mientras que, el flujo financiero una TIR de 30,32 % con un periodo de recupero de 4,16 años. Finalmente, se determinó que el impacto social del proyecto, a través de la relación producto-capital, genera 5,92 soles de valor agregado por cada sol invertido, por lo tanto, el proyecto tendrá impacto positivo en la economía del país.es_PE
dc.description.abstractThe study assesses the commercial, technical, economic, financial and social viability of the installation of processing plant of flexible helmet made recycled helmet for Peruvian market. The demand of project for the first year is 16 838 helmets. The target audience is made of people from 18 to 35 years old belonging to the NSE A y B. In addition, the price of flexible helmet is of S/105.00. Regarding the location of the plant, it is in Barranco- Lima, mainly due to its proximity to supplier of plastic and cycle vias, also the price of rent, which was determined using the factor ranking method. The production process consists of the following stages: pelletized, thermoformed, assembled, die-cut, painted, assembled and packaged; being the raw material recycled plastic HDPE. Likewise, the plant has an installed capacity of 17410, which was defined by the assembly, which is the bottleneck of the process. The total area proposed for the plant is 435 m2. The project will have an investment of 627,818 and presents a financing structure of 40% debt and 60% own contribution. The debt will be financed by Scotiabank for 05 years at an 11% TEA for long-term loans to medium-sized companies. On the other hand, the economic and financial evaluation of the project is carried out. The economic flow reveals an IRR of 26.14% with a recovery period of 4,29 years, while the financial flow reveals an IRR of 30,32% with a recovery period of 4,16 years. Finally, it was determined that the social impact of the project, through the product-capital ratio, generates 5,92 soles of added value for each sol invested, therefore, the project will have a positive impact on the country's economy.en_EN
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad de Limaes_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/*
dc.sourceRepositorio Institucional - Ulimaes_PE
dc.sourceUniversidad de Limaes_PE
dc.subjectCascos de seguridades_PE
dc.subjectResiduos plásticoses_PE
dc.subjectPlásticoses_PE
dc.subjectEstudios de prefactibilidades_PE
dc.subjectProyectos industrialeses_PE
dc.subjectSafety hatsen_EN
dc.subjectPlastic scrapen_EN
dc.subjectPlasticsen_EN
dc.subjectPrefeasibility studiesen_EN
dc.subjectIndustrial projectsen_EN
dc.subject.classificationIngeniería industrial / Producciónes_PE
dc.titleEstudio de prefactibilidad para la instalación de una planta procesadora de cascos plegables elaborados de plástico reciclado HDPEes_PE
dc.title.alternativePrefeasibility study for the installation of processing plant of flexible helmet made recycled HELMETen_EN
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.grantorUniversidad de Lima. Facultad de Ingeniería y Arquitecturaes_PE
thesis.degree.levelTítulo profesionales_PE
thesis.degree.nameIngeniero Industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_PE
renati.author.dni74883095
renati.advisor.orcidhttps://orcid.org/0000-0002-5239-0456es_PE
renati.advisor.dni06609745
renati.jurorVásquez Rivas Plata, Ruth
renati.jurorSeminario García, Juan Carlos
renati.jurorYácono Llanos, Juan Carlos
renati.discipline722026es_PE


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess