Mostrar el registro sencillo del ítem

dc.contributor.advisorSantos Figueroa, Luis Enrique
dc.contributor.authorRamírez del Villar Lizares, Gonzalo Eduardo
dc.contributor.authorCaballero Reyes, Álvaro Diego
dc.date.accessioned2022-06-21T16:24:49Z
dc.date.available2022-06-21T16:24:49Z
dc.date.issued2022
dc.identifier.citationRamírez del Villar Lizares, G. E. y Caballero Reyes, A. D. (2022) Estudio de prefactibilidad para la instalación de una planta procesadora de café molido gourmet [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/15998es_PE
dc.identifier.urihttps://hdl.handle.net/20.500.12724/15998
dc.description.abstractEl presente trabajo de investigación busca determinar la factibilidad en la instalación de una planta procesadora de café molido gourmet en el Perú. Para establecer la factibilidad del proyecto se realizó un exhaustivo estudio de mercado, se determinó el proceso productivo y se evaluó la inversión, costos y presupuestos del estudio. El producto ofrecido es una bebida energética con gran potencial en el mercado peruano, la cual permite reducir medidas corporales y aumentar la fuerza y vitalidad física. El mercado objetivo está conformado por adultos pertenecientes a los niveles socioeconómicos A y B, que residen en Lima Metropolitana y tienen la particularidad de consumir café molido, regularmente. En el año 2019, el café molido y tostado creció 10,3% en los niveles socioeconómicos A y B. El crecimiento es más significativo en Lima, donde se concentra el 80% de su valor. La planta estará localizada en la ciudad de Quillabamba, Provincia La Convención (Cusco) debido a la disponibilidad de materia prima y mano de obra, costo del terreno, efectos del clima y otros factores evaluados. Se estimó adquirir un terreno de 1 200m2. El tamaño de planta está definido por el tamaño-mercado con una demanda inicial de 68 655,75 kg (274 623 bolsas) y final de 74 857,53 kg (299 431 bolsas). El proceso de producción es semiautomático y cuenta con tecnología flexible acreditada por maquinaria de origen extranjero. La capacidad real de la planta está determinada por la operación de tostado (cuello de botella) con una producción anual de 163 537,92 kilogramos (654 151 bolsas); garantizando así, el cumplimiento de la demanda del proyecto. La inversión estimada ronda los S/ 1 854 609,51, 60% financiado mediante un préstamo y el restante (40%), por aporte de capital propio. Los resultados de la evaluación económica y financiera manifiestan la viabilidad del proyecto, pues se obtuvo un VANE y VANF de S/ 1 239 312,27 y S/ 1 118 970,54, respectivamente. Además, un TIRE del 28,41% (TIRE > CPPC) y TIRF del 51,81% (TIR > COK), y la inversión se recupera antes del cuarto año. Por último, los ratios financieras indican que existirá buena liquidez, una capacidad de pago oportuna por deudas y un crecimiento económico significativo.es_PE
dc.description.abstractThe following research work aims to determine the feasibility regarding the installation of a gourmet ground coffee processing plant in Peru. In order to accomplish the above, an exhaustive market study was carried out, the production process has been established and the financial investment as well as the relation to a fixed budget were assessed. The product is an energizing beverage, with great potential in the Peruvian market, which allows reducing body measurements and increasing physical strength and vitality. The target market consists of adult men and women (18+) belonging to socioeconomic levels A and B, who live in the city of Lima and consume ground coffee regularly. In 2019, ground and roasted coffee product intake increased 10,3% in socioeconomic levels A and B. Most significant growth is in Lima, where 80% of its value is focused. The industrial plant will be located in the city of Quillabamba, La Convención province (Cusco) due to a series of factors like raw material availability, labor force availability, land cost, weather, among others. A 1 200m2 approximated area is required to start operations. Plant size was fixed by market size with a 68 655,75 kg (274 623 bags) initial demand and a 74 857,53 kg (299 431 bags) final demand. The production process is semi-automatic and has flexible technology backed by foreign origin machinery. The real capacity of the plant is related to the roasting operation (bottleneck), having 163 537,92 kilograms (654 151 bags) annual production; and thus, fulfilling the project’s product demand. Monetary investment 1 854 609,51 PEN, 60% being financed and the remaining 40% managed by own capital. The results of the economic and financial evaluation show the project’s viability, having a VANE and VANF of 1 239 312,27 PEN and 1 118 970,54 PEN, respectively. In addition, a 28,41% EIRR (IRR > WACC) and a 51,81% FIRR (IRR> COK) are achieved, and the investment is recovered by the end of the fourth year. Finally, the ratio analysis indicates that there will be a high liquidity, a strong payment capacity regarding debts and a significant annual economic growthen_EN
dc.formatapplication/pdf
dc.language.isospa
dc.publisherUniversidad de Limaes_PE
dc.rightsinfo:eu-repo/semantics/openAccess*
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/4.0/*
dc.sourceRepositorio Institucional Ulima
dc.sourceUniversidad de Lima
dc.subjectCoffeeen_EN
dc.subjectPrefeasibility studiesen_EN
dc.subjectCafées_PE
dc.subjectEstudios de prefactibilidades_PE
dc.subject.classificationIngeniería industrial / Producciónes_PE
dc.titleEstudio de prefactibilidad para la instalación de una planta procesadora de café molido gourmetes_PE
dc.title.alternativePrefeasibility study for the installation of a gourmet ground coffee processing planten_EN
dc.typeinfo:eu-repo/semantics/bachelorThesis
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.grantorUniversidad de Lima. Facultad de Ingeniería y Arquitecturaes_PE
thesis.degree.levelTítulo profesionales_PE
dc.type.otherTesis
thesis.degree.nameIngeniero industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04
renati.author.dni70365340
renati.author.dni76628426
renati.advisor.orcidhttps://orcid.org/0000-0002-0867-6094
renati.advisor.dni8783308
renati.jurorHeinrich Saavedra, Marco Antonio
renati.jurorFajardo Pérez -Vargas, Carla Patricia Milagros
renati.jurorIngar Cangalaya, Araken Andrés
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesional*
renati.typehttps://purl.org/pe-repo/renati/type#tesis*
renati.discipline722026
ulima.catOI
dc.identifier.isni121541816


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess