Mostrar el registro sencillo del ítem
Estudio de mejora para los indicadores de cumplimiento de avance de obra en la empresa Pegama Ingenieros
dc.contributor.advisor | Zaldívar Peña, Doris Adriana | |
dc.contributor.author | Rodriguez Rojas, Stephen Amadeo | |
dc.date.accessioned | 2022-08-31T18:10:18Z | |
dc.date.available | 2022-08-31T18:10:18Z | |
dc.date.issued | 2022 | |
dc.identifier.citation | Rodriguez Rojas, S. A. (2022). Estudio de mejora para los indicadores de cumplimiento de avance de obra en la empresa Pegama Ingenieros [Trabajo de suficiencia profesional para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/16455 | es_PE |
dc.identifier.uri | https://hdl.handle.net/20.500.12724/16455 | |
dc.description.abstract | El presente proyecto profesional se desarrolla en la empresa PEGAMA INGENIEROS, que es una contratista especializada en brindar servicios en minería subterránea. PEGAMA es una empresa que incumplía sus programas de avance y producción en un promedio de 97% debido a una baja disponibilidad mecánica que bordeaban el 54% en 2 de sus 10 equipos de carguío y la falta de suministros utilizados en las operaciones. La baja disponibilidad se debía a que sus equipos ya habían superado las 13 000 horas de su vida útil esperada y la falta de suministros tenía, como causa raíz, una mala gestión del área logística, pues los procesos internos del área no estaban estandarizados y los almacenes no estaban ordenados ni clasificados. Después de identificar las causas raíces, PEGAMA decide implementar un taller donde realizar el overhaul de sus equipos de carguío y de esta manera darles una segunda vida. Para esto, primero se definen las áreas de trabajo y su ubicación dentro del taller. Posteriormente, se realiza la adquisición de las herramientas y equipos necesarios. Después, se realizan las instalaciones eléctricas y sanitarias de acuerdo a las necesidades de los trabajos a ejecutar dentro del taller. Finalmente, después de haber terminado con la implementación del taller y una inversión alrededor de 226 000 .00 dólares, se ejecutó el primer overhaul de un cargador de bajo perfil. Por otro lado, el área logística define y estandariza sus procesos internos e implementa 5S en los almacenes con el objetivo de optimizar espacios y que los tiempos de ejecución de las tareas realizadas por los auxiliares disminuya significativamente. Como consecuencia de la implementación del presente proyecto profesional, se ve una notable mejora en el cumplimiento de los programas de avance y producción. | es_PE |
dc.description.abstract | This professional project is developed in the company called PEGAMA INGENIEROS, which is a contractor specialized in providing subway mining services. PEGAMA did not comply with its process and production schedules by an average of 97% due to low mechanical availability that bordered on 54% in 2 of its 10- loading equipment and the lack of supplies used in operations. The low availability was due to the fact that its equipment had already exceeded 13,000 hours of its expected useful life and the lack of supplies was caused by poor management of the logistics area, since the area's internal processes were not standardized and the warehouses were not sorted or classified. After identifying the root causes, PEGAMA decided to implement a workshop to overhaul its loading equipment and thus, give them a second life. For this purpose, first, the work areas and their location within the workshop are defined. Subsequently, the necessary tools and equipment are purchased. Afterwards, the electrical and sanitary installations are made according to the needs of the works to be executed inside the workshop. Finally, after having finished with the implementation of the workshop and an investment of around US$226,000, the first overhaul of a low-profile loader was executed. On the other hand, the logistics area defines and standardizes its internal processes and implements 5S in the warehouses in order to optimize spaces and significantly reduce the execution time of the tasks performed by the auxiliary staff. As a consequence of the implementation of this professional project, there has been a notable improvement in the fulfillment of the progress and production schedules. | en_EN |
dc.format | application/pdf | |
dc.language.iso | spa | |
dc.publisher | Universidad de Lima | |
dc.rights | info:eu-repo/semantics/openAccess | * |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/4.0/ | * |
dc.source | Repositorio Institucional. Ulima | |
dc.source | Universidad de Lima | |
dc.subject | Process control | en_EN |
dc.subject | Productivity | en_EN |
dc.subject | Continuous improvement process | en_EN |
dc.subject | Strategic planning | en_EN |
dc.subject | Industrial efficiency | en_EN |
dc.subject | Mineral industries | en_EN |
dc.subject | Control de procesos | es_PE |
dc.subject | Productividad | es_PE |
dc.subject | Proceso de mejora continua | es_PE |
dc.subject | Planeamiento estratégico | es_PE |
dc.subject | Eficiencia industrial | es_PE |
dc.subject | Industria minera | es_PE |
dc.subject.classification | Ingeniería industrial / Tecnología de procesos | es_PE |
dc.title | Estudio de mejora para los indicadores de cumplimiento de avance de obra en la empresa Pegama Ingenieros | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | |
thesis.degree.discipline | Ingeniería Industrial | es_PE |
thesis.degree.grantor | Universidad de Lima. Facultad de Ingeniería y Arquitectura | es_PE |
thesis.degree.level | Título Profesional | es_PE |
dc.type.other | Trabajo de suficiencia profesional | |
thesis.degree.name | Ingeniero Industrial | es_PE |
dc.publisher.country | PE | |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.11.04 | |
renati.juror | Arroyo Gordillo, Pedro Antonio | |
renati.juror | Zaldívar Peña, Doris Adriana | |
renati.juror | Vidal Paredes, Alex Antonio | |
renati.level | http://purl.org/pe-repo/renati/level#tituloProfesional | * |
renati.type | https://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional | * |
renati.discipline | 722026 | |
ulima.cat | OI | |
dc.identifier.isni | 121541816 |