Mostrar el registro sencillo del ítem

dc.contributor.advisorYácono Llanos, Juan Carlos
dc.contributor.authorMuguerza Orrego, Camila Rocio
dc.contributor.authorVera Ruiz, Diana Gabriela
dc.date.accessioned2022-08-31T21:31:07Z
dc.date.available2022-08-31T21:31:07Z
dc.date.issued2022
dc.identifier.citationMuguerza Orrego, C.R. y Vera Ruiz, D.G. (2022). Estudio de prefactibilidad para la instalación de una planta productora de cunas térmicas para niños menores de 2 años [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/16460es_PE
dc.identifier.urihttps://hdl.handle.net/20.500.12724/16460
dc.description.abstractEn el presente proyecto se desarrolla un estudio preliminar, el cual permitirá determinar la factibilidad de la instalación de una planta de producción de cunas térmicas. La cual pretende trabajar de la manera más eficiente en lo que respecta a procesos, costos y calidad de producto. En el primer capítulo del presente estudio se detallará la hipótesis, objetivos y justificación de la investigación. A continuación, se detallará la bibliografía existente, la cual se usará de referencia para el estudio y se brindará un marco conceptual del proyecto para entender las distintas terminologías. A lo largo del segundo capítulo, se definirá al producto, sus usos y principales características, y, por otro lado, se detallarán sus bienes complementarios y sustitutos. Asimismo, se analizará el sector industrial de cunas térmicas y se detallará la oferta y la demanda existentes. Posteriormente, a partir de la data recolectada, se calcula la demanda de 19,062 cunas, tomando en cuenta los factores como el número de hogares en Lima Metropolitana, cantidad de mujeres en edad fértil, nivel socioeconómico A y B, etc. En el tercer y cuarto capítulo, se desarrollará la localización y los factores, donde se eligió al departamento de Lima en el distrito de Villa el Salvador, y el tamaño de la planta, respectivamente. Mediante las distintas técnicas y análisis de ingeniería, se definirá un tamaño de planta que está limitado por el tamaño mercado. El quinto capítulo desarrollará todos los puntos relacionados a la Ingeniería del proyecto. Se analizará las especificaciones del producto, el proceso productivo del colchón térmico y el sistema de automatización. Finalmente, dentro del capítulo se presentará la disposición de la planta junto con el plano. Seguidamente, el capítulo seis presentará las principales características y la constitución de la empresa. Por último, en el capítulo siete, se determinará la rentabilidad del proyecto, teniendo un VAN de 1,483,980.75 soles, TIR económico (24%) es mayor que el COK (16%). lo cual nos indica que el proyecto es rentable.es_PE
dc.description.abstractIn the present project a preliminary study will be developed, which will allow to determine the preliminary feasibility of the installation of a thermal crib production plant. This plant is intended to work in the most efficient way in terms of processes, costs and product quality. The first chapter of this study will detail the hypothesis, objectives and justification of the research. Next, the existing bibliography will be detailed, which will be used as reference for the study and a conceptual framework of the project will be provided to understand the different terminologies. Throughout the second chapter, the product, its uses and main characteristics will be defined, and, on the other hand, its complementary and substitute goods will be detailed. Likewise, the industrial sector of thermal cribs will be analyzed and the existing supply and demand will be detailed. Later, from the data collected, the demand for the project will be calculated, around 19,062 cribs, taking in consideration the following aspects: number of household in Lima Metropolitana, number of women in childbearing age, percentage of people in socioeconomic level A y B and more. In the third and fourth chapter, the location and how the city of Lima, exactly in Villa el Salvador was choose is developed, and size of the plant, respectively. By means of the different techniques and engineering analysis, a size of plant limited by the size of the market will be defined. The fifth chapter will develop all the points related to the engineering of the project. The product specifications, the production process and the regulatory framework will be analyzed. Finally, the chapter will present the layout of the plant, its maintenance and safety policies, among other points. Then, chapter six will present the main characteristics and the constitution of the company. Finally, in chapter seven, the profitability of the project will be determined, having a VNA equals to S/1,483,980.75 and IRR economic (24%) is higher than COK (16%), which means the project is profitable.es_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad de Limaes_PE
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/4.0/*
dc.sourceRepositorio Institucional - Ulimaes_PE
dc.sourceUniversidad de Limaes_PE
dc.subjectMuebles infantileses_PE
dc.subjectProyectos industrialeses_PE
dc.subjectEstudios de prefactibilidades_PE
dc.subjectChildren's furniturees_PE
dc.subjectIndustrial projectses_PE
dc.subjectPrefeasibility studieses_PE
dc.subject.classificationIngeniería industrial / Producciónes_PE
dc.titleEstudio de prefactibilidad para la instalación de una planta productora de cunas térmicas para niños menores de 2 añoses_PE
dc.title.alternativePrefeasibility study for the installation for a plant for the production of thermal cribs for children under 2 years oldes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesis
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.grantorUniversidad de Lima. Facultad de Ingeniería y Arquitecturaes_PE
thesis.degree.levelTítulo profesionales_PE
thesis.degree.nameIngeniero Industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04
renati.author.dni75272864
renati.author.dni74939061
renati.advisor.orcidhttps://orcid.org/0000-0002-1191-855X
renati.advisor.dni06707601
renati.jurorMoy Vargas, Luis Teodomiro
renati.jurorYácono Llanos, Juan Carlos
renati.jurorArturo Meini Mendez, Oswaldo Guillermo
renati.jurorSalinas Pedemonte, Pedro Arturo
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesional
renati.discipline722026


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess