Mostrar el registro sencillo del ítem
Minimization of Product Distribution Delays through An Integration Model of Lean Manufacturing Tools and A3 Report-Case Study
dc.contributor.author | Pajuelo Rojas, Katherine Kathleen | |
dc.contributor.author | Quiroz Flores, Juan Carlos | |
dc.contributor.author | Nallusamy, S. | |
dc.contributor.other | Quiroz Flores, Juan Carlos | |
dc.date.accessioned | 2023-11-29T18:07:15Z | |
dc.date.available | 2023-11-29T18:07:15Z | |
dc.date.issued | 2023 | |
dc.identifier.citation | Pajuelo Rojas, K, K., Quiroz-Flores, J. C., & Nallusamy, S. (2023). Minimization of Product Distribution Delays through An Integration Model of Lean Manufacturing Tools and A3 Report - Case Study. SSRG International Journal of Mechanical Engineering, 10(9), 31-43. https://doi.org/10.14445/23488360/IJME-V10I9P103 | es_PE |
dc.identifier.uri | https://hdl.handle.net/20.500.12724/19436 | |
dc.description.abstract | Latin American and Caribbean Gross Domestic Product (GDP) is about 70% of manufacturing. Product supply is vital for mass consumption enterprises due to population consumption. Improving value chain logistics maximizes business opportunities. Hygiene products sell well. Pallet shortages impede delivery. This study proposes a model that integrates the Lean Six Sigma framework, the lean manufacturing principles, and the A3 report as communication and monitoring tools to ensure improvement success. Increased pallets supply sped product delivery. The integrated model uses the design for Six Sigma and standardized work tools to design the new process and the A3 report methodology to show the importance of the problem, the countermeasures proposed for immediate implementation, and the indicators for monitoring and controlling the improvement project. Performance increased pallet availability by 92%. The new process of pallet repairs increased efficiency to 95%. This study sets the stage for future research and may help other firms with comparable difficulties. | en_EN |
dc.format | application/html | |
dc.language.iso | eng | |
dc.publisher | Seventh Sense Research Group | |
dc.rights | info:eu-repo/semantics/openAccess | * |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/4.0/ | * |
dc.source | Repositorio Institucional Ulima | |
dc.source | Universidad de Lima | |
dc.subject | Lean manufacturing | en_EN |
dc.subject | Standardization | en_EN |
dc.subject | Process control | en_EN |
dc.subject | Producción eficiente | es_PE |
dc.subject | Normalización | es_PE |
dc.subject | Control de procesos | es_PE |
dc.subject.classification | Pendiente | es_PE |
dc.title | Minimization of Product Distribution Delays through An Integration Model of Lean Manufacturing Tools and A3 Report-Case Study | en_EN |
dc.type | info:eu-repo/semantics/article | |
dc.type.other | Artículo en Scopus | |
ulima.areas.lineasdeinvestigacion | Desarrollo empresarial / Operaciones y logística | es_PE |
dc.identifier.journal | SSRG International Journal of Mechanical Engineering | |
dc.publisher.country | IN | |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.04.02 | |
dc.identifier.doi | https://doi.org/10.14445/23488360/IJME-V10I9P103 | |
dc.contributor.student | Pajuelo Rojas, Katherine Kathleen (Ingeniería Industrial) | |
ulima.cat | 9 | |
ulima.autor.afiliacion | Engineering Faculty, Industrial Engineering Career, University of Lima | |
ulima.autor.carrera | Ingeniería Industrial | |
dc.identifier.isni | 0000000121541816 | |
dc.identifier.scopusid | 2-s2.0-85176610524 |
Ficheros en el ítem
Ficheros | Tamaño | Formato | Ver |
---|---|---|---|
No hay ficheros asociados a este ítem. |
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Ingeniería Industrial [123]