Mostrar el registro sencillo del ítem
Time optimization proposal for the design and execution of plumbing systems implementing VDC methodology: 6-floor building case study
| dc.contributor.advisor | Del Savio, Alexandre Almeida | |
| dc.contributor.author | Inciso Mayoria, Vanessa Estefania | |
| dc.contributor.author | Quinteros Pérez, Estella Arianna Nicole | |
| dc.date.accessioned | 2023-11-30T16:03:43Z | |
| dc.date.available | 2023-11-30T16:03:43Z | |
| dc.date.issued | 2023 | |
| dc.identifier.citation | Inciso Mayoria, V. E. & Quinteros Pérez, E. A. N. (2023). Time optimization proposal for the design and execution of plumbing systems implementing VDC methodology: 6-floor building case study [Tesis para optar el Título Profesional de Ingeniero Civil, Universidad de Lima]. Repositorio Institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/19455 | es_PE |
| dc.identifier.uri | https://hdl.handle.net/20.500.12724/19455 | |
| dc.description.abstract | In recent years, the architecture, engineering, and construction industry has been characterized by large losses of resources, time, and costs. One of the main reasons for this problem need for more integration and collaboration between project stakeholders in different areas and specialties. The design, coordination and installation of mechanical, plumbing, electrical (MEP), and fire protection (FP) systems represent one of the main areas of improvement in the construction industry, especially in complex projects. The present research implements the Virtual, Design and Construction (VDC) methodology as an empowering agent in the optimization of time in the design and execution processes of plumbing systems in a 6-floor building of approximately 2,120 square meters in Lima, Peru. Initially, the traditional workflow for designing and executing sanitary systems was mapped. Then, an optimized workflow was developed considering the principles of the VDC methodology. As a result of the optimized workflow, it is possible to foresee a 5% reduction in design time and a 23% reduction in execution time. | en_EN |
| dc.format | application/pdf | |
| dc.language.iso | spa | |
| dc.publisher | Universidad de Lima | |
| dc.rights | info:eu-repo/semantics/restrictedAccess | * |
| dc.source | Repositorio Institucional - Ulima | |
| dc.source | Universidad de Lima | |
| dc.subject | Instalaciones sanitarias | es_PE |
| dc.subject | Diseño asistido por computadora | es_PE |
| dc.subject | Plumbing | es_PE |
| dc.subject | Computer-aided design | es_PE |
| dc.title | Time optimization proposal for the design and execution of plumbing systems implementing VDC methodology: 6-floor building case study | es_PE |
| dc.type | info:eu-repo/semantics/bachelorThesis | |
| thesis.degree.level | Título Profesional | es_PE |
| thesis.degree.discipline | Ingeniería Civil | es_PE |
| thesis.degree.grantor | Universidad de Lima. Facultad de Ingeniería y Arquitectura | es_PE |
| dc.publisher.country | PE | |
| dc.type.other | Tesis | |
| thesis.degree.name | Ingeniero Civil | es_PE |
| renati.advisor.orcid | https://orcid.org/0000-0002-6067-6606 | |
| renati.discipline | 732016 | |
| renati.author.dni | 75424409 | |
| renati.author.dni | 76965120 | |
| renati.advisor.cext | 001072041 | |
| renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | * |
| renati.juror | Viteri Valiente, Víctor Jesús | |
| renati.juror | Luna Torres, Ana Felicita | |
| renati.juror | Salinas Saavedra, José Roberto | |
| renati.type | https://purl.org/pe-repo/renati/type#tesis | * |
| dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.01.01 | |
| ulima.cat | 009 |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Tesis [36]




