Mostrar el registro sencillo del ítem
Production Management Model Based on SLP, 5S, and Standardized Work Tools to Increase OTIF Rate in a Shoe Repair Shop
dc.contributor.author | Bernardo Saavedra, Ernesto Alan Raúl | |
dc.contributor.author | Carpio Najera, Miguel Ángel | |
dc.contributor.author | Quiroz Flores, Juan Carlos | |
dc.contributor.other | Quiroz Flores, Juan Carlos | |
dc.date.accessioned | 2024-02-21T17:01:21Z | |
dc.date.available | 2024-02-21T17:01:21Z | |
dc.date.issued | 2023 | |
dc.identifier.citation | Bernardo Saavedra, E. A. R., Carpio Najera, M. A., & Quiroz Flores, J. C. (2023). Production Management Model Based on SLP, 5S, and Standardized Work Tools to Increase OTIF Rate in a Shoe Repair Shop. Proceedings of the 2023 6th International Conference on Information Management and Management Science. https://doi.org/10.1145/3625469.3625511 | es_PE |
dc.identifier.uri | https://hdl.handle.net/20.500.12724/19924 | |
dc.description.abstract | The footwear manufacturing industry in Peru is recovering from the economic crisis generated by the COVID-19 pandemic. Proof of this is the survival of companies with efficient inventory management, production plans, and product or service quality. The main objective of this research is to know the impact of Lean, SLP, and SW tools on the efficiency of a footwear handicraft workshop. The importance of the research is to provide a solution to the low efficiency of the workshops, mainly due to the poor distribution of the workstations that generated many unnecessary transfers and unproductive idle times that generated delays and waiting times. The proposed improvement model comprised the following tools: Systematic Distribution Planning, 5S, and Work Standardization. In addition, the Arena simulation tool was used to evaluate the results and validate the improvement proposal. As a result, 79% of the OTIF efficiency indicator was achieved, the effort was reduced by 40.6%, and cycle time by 2%. | es_PE |
dc.format | application/html | |
dc.language.iso | eng | |
dc.publisher | ACM | |
dc.relation.ispartof | urn:isbn:979-840070768-1 | |
dc.rights | info:eu-repo/semantics/restrictedAccess | * |
dc.source | Repositorio Institucional Ulima | es_PE |
dc.source | Universidad de Lima | es_PE |
dc.subject | Pendiente | |
dc.title | Production Management Model Based on SLP, 5S, and Standardized Work Tools to Increase OTIF Rate in a Shoe Repair Shop | |
dc.type | info:eu-repo/semantics/conferenceObject | |
dc.type.other | Artículo de conferencia en Scopus | |
dc.publisher.country | US | es_PE |
dc.subject.ocde | Pendiente | |
dc.identifier.doi | https://doi.org/10.1145/3625469.3625511 | |
dc.contributor.student | Bernardo Saavedra, Ernesto Alan Raúl (Ingeniería Industrial) | |
dc.contributor.student | Carpio Najera, Miguel Ángel (Ingeniería Industrial) | |
ulima.cat | OI | |
ulima.autor.afiliacion | Engineering Faculty, Industrial Engineering Career, Universidad de Lima | es_PE |
ulima.autor.carrera | Ingeniería Industrial | es_PE |
dc.identifier.scopusid | 2-s2.0-85180124133 | |
dc.identifier.event | Proceedings of the 2023 6th International Conference on Information Management and Management Science |
Ficheros en el ítem
Ficheros | Tamaño | Formato | Ver |
---|---|---|---|
No hay ficheros asociados a este ítem. |
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Ingeniería Industrial [135]