Mostrar el registro sencillo del ítem
Improvement proposal to increase the oee in a mechanical press in the metalworking sector through SMED and TPM
dc.contributor.advisor | Flores Pérez, Alberto Enrique | |
dc.contributor.author | Cáceres Larco, Mauricio Anibal | |
dc.contributor.author | Zegarra Silva, Joaquín Andrés | |
dc.date.accessioned | 2024-06-21T13:12:54Z | |
dc.date.available | 2024-06-21T13:12:54Z | |
dc.date.issued | 2024 | |
dc.identifier.citation | Caceres Larco, M. A., & Zegarra Silva, J. A. (2024). Improvement proposal to increase the oee in a mechanical press in the metalworking sector through SMED and TPM [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio Institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/20744 | es_PE |
dc.identifier.uri | https://hdl.handle.net/20.500.12724/20744 | |
dc.description | El acceso al texto completo de la tesis estará habilitado el 21 de junio de 2026, por expresa disposición del autor. | es_PE |
dc.description.abstract | El sector metalmecánico es uno de los impactan en mayor medida al Perú, poseyendo el 25.9% de la PEA de industria manufacturera. Por ello mismo, es vital aprovechar al máximo la disponibilidad de sus máquinas. En el caso de estudio, se identificó que una empresa perteneciente a este sector contaba con un OEE del 56.39%. Esto generaba que, mensualmente, la organización tuviera una pérdida económica de $55,892.85. Esto era provocado por numerosas fallas de máquina y un deficiente set up. Para solucionar ello, se propuso un modelo que combina las herramientas TPM y SMED, con un soporte de la herramienta 5S. De este modo, se logró incrementar el OEE a 88.45% y reducir los tiempos de set up de un valor inicial de 24.09 a 12.85 minutos. Además, se logró aumentar la disponibilidad en un 40.58%. Por otro lado, es importante indicar que se realizó una evaluación económica en la que se logró demostrar que al cabo de un año se obtuvo un VAN de $99,286.89, un TIR de 67% y un periodo de recuperación de 4 meses y 13 días. Cabe resaltar que el presente modelo propuesto fue validado por medio del software de simulación Arena. | es_PE |
dc.description.abstract | The metalworking sector is one of the industries that has more impact on Peru, representing 25.9% of the manufacturing industry's workforce. Therefore, it is crucial for them to approach the biggest availability possible for its machines. In this case study, it was identified that a company that belonged to this sector had an OEE (Overall Equipment Efficiency) of 56.39%. This resulted in a monthly economic loss of $55,892.85, caused by numerous machine failures and a deficient set-up process. A model that combined TPM (Total Productive Maintenance) and SMED (Single-Minute Exchange of Die) methodologies was proposed to solve the issue, supported by the 5S tool. As a result, the OEE increased to 88.45%, and the set-up time was reduced from an initial value of 24.09 to 12.85 minutes. Additionally, the availability was increased by 40.58%. Furthermore, it is important to note that an economic evaluation was done, showing that after one year, a Net Present Value (NPV) of $99,286.89 was achieved, with an Internal Rate of Return (IRR) of 67% and a payback period of 4 months and 13 days. Finally, it is worth mentioning that the proposed model was validated using a simulation through Arena software. | en_EN |
dc.format | application/pdf | |
dc.language.iso | eng | |
dc.publisher | Universidad de Lima | |
dc.rights | info:eu-repo/semantics/embargoedAccess | * |
dc.source | Repositorio Institucional Ulima | |
dc.source | Universidad de Lima | |
dc.subject | Pendiente | en_EN |
dc.subject | Pendiente | es_PE |
dc.title | Improvement proposal to increase the oee in a mechanical press in the metalworking sector through SMED and TPM | en_EN |
dc.type | info:eu-repo/semantics/bachelorThesis | |
thesis.degree.discipline | Ingeniería Industrial | |
thesis.degree.grantor | Universidad de Lima. Facultad de Ingeniería | |
thesis.degree.level | Título profesional | |
dc.type.other | Tesis | |
thesis.degree.name | Ingeniero Industrial | |
dc.publisher.country | PE | |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.11.04 | |
renati.author.dni | 70315972 | |
renati.author.dni | 72931363 | |
renati.advisor.orcid | https://orcid.org/0000-0003-0813-0662 | |
renati.advisor.dni | 9278816 | |
renati.juror | Calderon Gonzales, Wilson David. | |
renati.juror | Quiroz Flores, Juan Carlos | |
renati.juror | Flores Pérez, Alberto Enrique | |
renati.level | http://purl.org/pe-repo/renati/level#tituloProfesional | * |
renati.type | https://purl.org/pe-repo/renati/type#tesis | * |
renati.discipline | 722026 | |
dc.date.embargoend | 2026-06-21 | |
ulima.cat | OI | |
dc.identifier.isni | 121541816 |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Tesis [905]