Prefabricated Reinforcement in Construction Using VDC: Case Study Ovalo Monitor Bridge
Ver/
Tesis
(application/pdf: 763.8Kb)
(application/pdf: 763.8Kb)
Autorización
(application/pdf: 225.0Kb)
(application/pdf: 225.0Kb)
Reporte de similitud
(application/pdf: 3.237Mb)
(application/pdf: 3.237Mb)
Fecha
2024Asesor(es)
Metadatos
Mostrar el registro completo del ítemResumen
In construction projects, there may be rework and delays associated with construction processes with a low level of industrialization, resulting from the lack of constructability of the designs. To promote industrialization and improve the project's constructability, we implemented the Virtual Design & Construction (VDC) methodology, combined with
a system of prefabricated reinforcement cages (PRC) elements in constructing an 870-
meter span bridge located in Lima, Peru. The objective was to reduce structural rebars'
assembly times, replace the traditional on-site processes of cutting, bending, and assembling steel with an industrial process based on systems of PRC steel elements. As
a result, the assembly times of the structural item were reduced by 31%, thanks to the use of PRC elements. In addition, due to the VDC methodology, a 100% buildable design of the PRC elements was achieved.
Cómo citar
Tuesta Schuler, R., & Vicuña Jimenez, M. A. (2024). Prefabricated Reinforcement in Construction Using VDC: Case Study Ovalo Monitor Bridge [Tesis para optar el Título Profesional de Ingeniero Civil, Universidad de Lima]. Repositorio Institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/21287Editor
Universidad de LimaTemas
Coleccion(es)
- Tesis [20]