Mostrar el registro sencillo del ítem
Analysis of the Construction Sequence of a Reaction Wall in a Structural Laboratory Supported by the VDC Methodology
| dc.contributor.author | Rengifo Fuentes, Rafael Jesús | |
| dc.contributor.author | Valdez Eguiluz, Noe Antonio | |
| dc.contributor.author | Del Savio, Alexandre Almeida | |
| dc.contributor.other | Del Savio, Alexandre Almeida | |
| dc.date.accessioned | 2025-01-14T16:02:32Z | |
| dc.date.available | 2025-01-14T16:02:32Z | |
| dc.date.issued | 2024 | |
| dc.identifier.citation | Rengifo Fuentes, R. J., Valdez Eguiluz, N. A.& Del Savio, A. A. (2024). Analysis of the Construction Sequence of a Reaction Wall in a Structural Laboratory Supported by the VDC Methodology. Applied Sciences (Switzerland). https://doi.org/10.3390/app14219622 | |
| dc.identifier.issn | 2076-3417 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.12724/21830 | |
| dc.description.abstract | The structures laboratory is a crucial facility for supporting research development related to the construction industry. This kind of laboratory has several components, and one of its key components is the reaction wall. The reaction wall supports the execution of experimental tests on structural elements under specific configurations and loads. Constructing a reaction wall presents challenges due to the highest standards to be met. This research analyzes the construction process of a reaction wall at a private university in Peru. Initially, a schedule was proposed by a contractor. However, the client, knowing the complexity of such construction, asked to review the initial schedule to ensure that it would meet the constructability requirements under the integrated product-organization-process approach given by the virtual design and construction (VDC) methodology. The result of this study pointed out the need to revise the original proposed schedule, extending the construction time to 66% due to the lack of construction processes compatible with the requirements for the reaction wall’s execution. Finally, a survey was conducted to observe the learning curve associated with implementing the VDC methodology. © 2024 by the authors. | |
| dc.format | application/html | |
| dc.language.iso | eng | |
| dc.publisher | Multidisciplinary Digital Publishing Institute (MDPI) | |
| dc.rights | info:eu-repo/semantics/openAccess | |
| dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | |
| dc.source | Repositorio Institucional - Ulima | |
| dc.source | Universidad de Lima | |
| dc.subject | Pendiente | |
| dc.title | Analysis of the Construction Sequence of a Reaction Wall in a Structural Laboratory Supported by the VDC Methodology | en_EN |
| dc.type | info:eu-repo/semantics/article | |
| dc.identifier.journal | Applied Sciences (Switzerland) | |
| dc.publisher.country | CH | |
| dc.type.other | Artículo en Scopus y Web of Science | |
| dc.identifier.isni | 121541816 | |
| ulima.autor.carrera | Del Savio, Alexandre Almeida (ingeniería Civil) | |
| dc.identifier.wosid | WOS:001351076600001 | |
| dc.contributor.student | Rengifo Fuentes, Rafael Jesús (Ingeniería Civil) | |
| dc.contributor.student | Valdez Eguiluz, Noe Antonio (Ingeniería Civil) | |
| ulima.autor.afiliacion | Del Savio, Alexandre Almeida (Carrera de Ingeniería Civil, Facultad de Ingeniería, Universidad de Lima) | |
| dc.subject.ocde | Pendiente | |
| dc.identifier.doi | https://doi.org/10.3390/app14219622 | |
| ulima.lineadeinvestigacion | Pendiente | es_PE |
| ulima.cat | Pendiente | |
| dc.identifier.scopusid | 2-s2.0-85208475877 |
Ficheros en el ítem
| Ficheros | Tamaño | Formato | Ver |
|---|---|---|---|
|
No hay ficheros asociados a este ítem. |
|||
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Ingeniería Civil [46]

