| dc.contributor.advisor | Cárdenas Sánchez Díaz, Jesús Benjamín | |
| dc.contributor.author | Rojas Villanueva, David Guillermo | |
| dc.contributor.author | Sucantaype Lizano, Carlos Fernando | |
| dc.date.accessioned | 2026-01-26T20:42:57Z | |
| dc.date.available | 2026-01-26T20:42:57Z | |
| dc.date.issued | 2025 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.12724/24220 | |
| dc.description.abstract | El presente trabajo de investigación tiene como finalidad analizar la viabilidad técnica, financiera y social para la implementación de una planta de fabricación de inodoros incorporados con lavamanos de una sola pieza en el departamento de Lima-Perú.
El producto se presenta como alternativa de solución al excesivo gasto de agua en los hogares de Lima Metropolitana y al crecimiento del sector inmobiliario que exige la optimización y adecuada distribución de los espacios, entre ellos el aprovechamiento del espacio del baño.
En primer lugar, se realizó el estudio de mercado para determinar la demanda del proyecto, para ellos se tomó en cuenta la demanda potencial, los tipos de vivienda y el mercado objetivo en base a datos cuantitativos.
En segundo lugar, se evaluó y se seleccionó la localización de planta según los factores de macro y micro localización, así como el méodo de ranking de factores.
En tercer lugar, se analizó las relaciones existentes entre la capacidad de producción con el mercado, recursos y tecnologías para determinar el tamaño de planta.
En cuarto lugar, para la ingeniería de proyecto se evaluó la tecnología adecuada como filtros de carbón activado para la reutilización del agua. También, se definió el diagrama de operaciones del proceso y se calculó la capacidad instalada además del área requerida mediante el método de Guerchet.
Finalmente, se calculó el presupuesto requerido para la implementación e instalación de la planta y se evaluó la viabilidad del proyecto teniendo en cuenta los indicadores económicos y financieros. | es_PE |
| dc.description.abstract | The purpose of this research work is to analyze the technical, financial and social feasibility for the implementation of a manufacturing plant for built-in toilets with one-piece sinks in the department of Lima-Peru.
The product is presented as an alternative solution to the excessive consumption of water in the homes of Metropolitan Lima and to the growth of the real estate sector that requires the optimization and adequate distribution of spaces, including the utilization of bathroom space.
In the first place, the market study was carried out to determine the demand for the project, for them the potential demand, the types of housing and the target market were taken into account based on quantitative data.
Second, the plant location was evaluated and selected according to the macro and micro location factors, as well as the factor ranking method.
Third, the existing relationships between production capacity with the market, resources and technologies were analyzed to determine the size of the plant.
Fourth, for the project engineering, the appropriate technology for water reuse was evaluated. Also, the process operations diagram was defined and the installed capacity in addition to the required area was calculated using the Guerchet method.
Finally, the budget required for the implementation and installation of the plant was calculated and the viability of the project was evaluated taking into account the economic and financial indicators. | en_EN |
| dc.format | application/pdf | |
| dc.language.iso | spa | |
| dc.publisher | Universidad de Lima | |
| dc.rights | https://purl.org/coar/access_right/c_abf2 | |
| dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/4.0/ | * |
| dc.subject | Pendiente | es_PE |
| dc.title | Estudio de prefactibilidad para la instalación de una planta de fabricacion de inodoros incorporados con lavaderos | es_PE |
| dc.title.alternative | Prefeasibility study for the installation of a manufacturing plant for incorporated toilets with sinks | en_EN |
| dc.type | https://purl.org/coar/resource_type/c_7a1f | |
| thesis.degree.level | Titulo profesional | |
| thesis.degree.discipline | Ingeniería Industrial | |
| thesis.degree.grantor | Universidad de Lima. Facultad de Ingeniería | |
| dc.publisher.country | PE | |
| dc.type.other | Tesis | |
| thesis.degree.name | Ingeniero Industrial | |
| renati.advisor.orcid | https://orcid.org 0000-0002-4049-1372 | |
| renati.discipline | 722026 | |
| dc.identifier.isni | 0000000121541816 | |
| renati.author.dni | 75244562 | |
| renati.author.dni | 73682630 | |
| renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | |
| renati.advisor.dni | 10060600 | |
| renati.juror | Henrich Saavedra, Marco Antonio Pedro | |
| renati.juror | Sánchez Soto, Paul Angello Daniel | |
| renati.juror | Vásquez Rivas Plata, Ruth | |
| renati.juror | Cárdenas Sánchez Díaz, Jesús Benjamín | |
| renati.type | https://purl.org/pe-repo/renati/type#tesis | |
| dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.11.04 | |
| ulima.cat | OI | |