Mostrar el registro sencillo del ítem

dc.contributor.advisorChávez Ugáz, Rafael
dc.contributor.authorAlonso Inga, Victor Alberto
dc.contributor.authorFuentes Kuroda, Hiroshi Miguel
dc.date.accessioned2026-04-16T15:32:48Z
dc.date.available2026-04-16T15:32:48Z
dc.date.issued2026
dc.identifier.urihttps://hdl.handle.net/20.500.12724/24671
dc.description.abstractJewelry SMEs face delivery time challenges due to production delays that result in missed delivery dates for their clients. Therefore, the following field study aims to improve delivery time compliance in a jewelry SME. The main objective is to meet delivery dates by optimizing production processes and eliminating non value-added activities through the application of 5S, SMED, and SLP tools. The results obtained were a 43.2% difference in the 5S program, with a total reduction of 115.76 m with the SLP tool. Finally, a 30.32% reduction in set up times was achieved with the SMED tool. Therefore, the production process time was reduced by 117.01 minutes, contributing to an improvement in delivery times and achieving an 80% compliance level.en_EN
dc.description.abstractLas Pymes joyeras presentan problemas con respecto a los plazos de entrega, debido a demoras en el proceso productivo que derivan en incumplimientos en la fecha de entrega con sus clientes. Por consiguiente, el siguiente estudio de campo surge con el fin de mejorar el cumplimiento de los tiempos de entrega en una pyme joyera. El objetivo principal es cumplir con las fechas de entrega a través de la optimización de los procesos productivos eliminando actividades de valor no agregado, aplicando las herramientas 5S, SMED y SLP. Los resultados que se obtuvieron fueron una diferencia del 43.2% del programa 5s, la reducción total recorrida en 115.76 m con la herramienta SLP. Por último, una reducción de 30.32% de los tiempos de setup con la herramienta SMED. Por lo tanto, se obtuvo una disminución del tiempo del proceso productivo en 117.01 minutos contribuyendo a una mejora en los tiempos de entrega, obteniendo un 80% del nivel de cumplimiento.es_PE
dc.formatapplication/pdf
dc.language.isoeng
dc.publisherUniversidad de Lima
dc.rightshttps://purl.org/coar/access_right/c_16ec
dc.subjectProducción eficientees_PE
dc.subjectPequeñas y medianas empresases_PE
dc.subjectJoyeríases_PE
dc.titleImplementation of lean manufacturing and SLP in an SME in the jewelry sector: case studyen_EN
dc.typehttps://purl.org/coar/resource_type/c_7a1f
thesis.degree.levelTitulo profesional
thesis.degree.disciplineIngeniería Industrial
thesis.degree.grantorUniversidad de Lima. Facultad de Ingeniería
dc.publisher.countryPE
dc.type.otherTesis
thesis.degree.nameIngeniero Industrial
renati.advisor.orcidhttps://orcid.org/0000-0002-9450-0158
renati.discipline722026
dc.identifier.isni0000000121541816
renati.author.dni73678277
renati.author.dni75428516
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesional
renati.advisor.dni09539644
renati.jurorSantos Figueroa, Luis Enrique
renati.jurorMedardo Urbina Rivera, Carlos
renati.jurorChávez Ugáz, Rafael
renati.typehttps://purl.org/pe-repo/renati/type#tesis
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04
ulima.cat009


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem