Show simple item record

dc.contributor.authorAcosta Ramirez, Daniela Alejandra
dc.contributor.authorHerrera Noel, Alvaro Andree
dc.contributor.authorFlores Pérez, Alberto Enrique
dc.contributor.authorCollao Diaz, Martin Fidel
dc.contributor.authorQuiroz Flores, Juan Carlos
dc.contributor.otherFlores Pérez, Alberto Enrique
dc.contributor.otherCollao Diaz, Martin Fidel
dc.contributor.otherQuiroz Flores, Juan Carlos
dc.date.accessioned2023-02-14T17:32:39Z
dc.date.available2023-02-14T17:32:39Z
dc.date.issued2022
dc.identifier.citationAcosta-Ramirez, D. A., Herrera-Noel, A., Flores-Perez, A. E., Collao-Diaz, M. F. & Quiroz-Flores, J. C. (2022). Application of Lean Manufacturing tools under DMAIC approach to increase the NPS in a real estate company: A Research in Peru. In 2022 The 9th International Conference on Industrial Engineering and Applications (Europe) (pp. 70-76). https://doi.org/10.1145/3523132.3523144.es_PE
dc.identifier.urihttps://hdl.handle.net/20.500.12724/17599
dc.descriptionIndexado en Scopuses_PE
dc.description.abstractThe growing importance of continuous improvement in companies, focusing on the customer and greater competitiveness, the present research aims to propose a model based on Lean Manufacturing through the application of DMAIC Cycle to improve customer satisfaction and thereby increase the Net Promoter Score (NPS) of a real estate company, for this purpose applied a mixed research, descriptive-purposeful level, taking as analysis methodology Lean Manufacturing with the use of TQM, VSM and 5S tools, which in turn made use of the Ishikawa Diagram, Pareto and Customer Journey Map. As a result, an integrated model was obtained that allows identifying and eliminating activities that do not add value, analyzing and correcting failures in the customer experience that cause dissatisfaction, to increase the NPS from 28.83 current to 50 (sector average), proposing a continuous improvement plan through TQM, from the diagnosis obtained indicators were drawn and a simulation of the proposed model was carried out, concluding that it is effective in achieving the goals set and that within the first semester, according to the ARENA simulation, the NPS would increase to 35.53%.es_PE
dc.formatapplication/pdf
dc.language.isoenges_PE
dc.publisherAssociation for Computing Machineryes_PE
dc.relation.ispartofurn:isbn:978-145039605-9
dc.rightsinfo:eu-repo/semantics/restrictedAccesses_PE
dc.sourceRepositorio Institucional - Ulimaes_PE
dc.sourceUniversidad de Limaes_PE
dc.subjectProducción eficientees_PE
dc.subjectSatisfacción del clientees_PE
dc.subjectLean manufacturinges_PE
dc.subjectCustomer satisfactiones_PE
dc.subjectEmpresas inmobiliariases_PE
dc.subjectReal estate businesses_PE
dc.titleApplication of Lean Manufacturing tools under DMAIC approach to increase the NPS in a real estate company: A Research in Perues_PE
dc.typeinfo:eu-repo/semantics/conferenceObject
dc.type.otherArtículo de conferencia en Scopuses_PE
ulima.areas.lineasdeinvestigacionDesarrollo empresarial / Estrategias y comportamiento empresariales_PE
dc.identifier.journalACM International Conference Proceeding Series
dc.publisher.countryUSes_PE
dc.description.peer-reviewRevisión por pareses_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04
dc.identifier.doihttps://doi.org/10.1145/3523132.3523144
dc.type.versioninfo:eu-repo/semantics/publishedVersion
dc.contributor.studentAcosta Ramirez, Daniela Alejandra (Ingeniería Industrial)
dc.contributor.studentHerrera Noel, Alvaro Andree (Ingeniería Industrial)
ulima.autor.afiliacionFlores Pérez, Alberto Enrique (Facultad de Ingeniería y Arquitectura, Universidad de Lima)es_PE
ulima.autor.afiliacionCollao Diaz, Martin Fidel (Facultad de ingeniería y Arquitectura, Universidad de Lima)es_PE
ulima.autor.afiliacionQuiroz Flores, Juan Carlos (Facultad de ingeniería y Arquitectura, Universidad de Lima)es_PE
ulima.autor.carreraFlores Pérez, Alberto Enrique (Ingeniería Industrial)es_PE
ulima.autor.carreraCollao Diaz, Martin Fidel (Ingeniería Industrial)es_PE
ulima.autor.carreraQuiroz Flores, Juan Carlos (Ingeniería Industrial)es_PE


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record