Production Model to increase OEE through the application of Lean Manufacturing and Total Production Maintenance tools in animal feed manufacturing SMEs
View/ Open
Tesis
(application/pdf: 433.9Kb)
(application/pdf: 433.9Kb)
Autorización
(application/pdf: 479.4Kb)
(application/pdf: 479.4Kb)
Autorización
(application/pdf: 433.6Kb)
(application/pdf: 433.6Kb)
Reporte de similitud
(application/pdf: 2.636Mb)
(application/pdf: 2.636Mb)
Date
2022Advisor(s)
Metadata
Show full item recordAbstract
This research proposes a production model capable of increasing the Overall Equipment Effectiveness (OEE) using
the methodology Lean Manufacturing and TPM. The case study is a company in the livestock industry where the 4
phases of the model were implemented. The first phase is the implementation of the Poka-Yoke tool. Then follows
the implementation of the MRP. After that, the implementation of a preventive maintenance plan and the last phase is
implementing the 5’s tool. After validation in the Arena software and the simulation of the implemented production
model, it is shown that the OEE indicator increases by 15.69%, managing to achieve a productivity improvement.
How to cite
Espinoza Monge, A. P. J. & Zenteno Correa, Y. A. (2022). Production Model to increase OEE through the application of Lean Manufacturing and Total Production Maintenance tools in animal feed manufacturing SMEs [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/17190Publisher
Universidad de LimaCategory / Subcategory
Ingeniería industrial / Tecnología de procesosSubject
Collections
- Tesis [905]
The following license files are associated with this item: