Mostrar el registro sencillo del ítem

dc.contributor.authorQuinteros Perez, Estella Arianna Nicole
dc.contributor.authorInciso Mayoria, Vanessa Estefania
dc.contributor.authorDel Savio, Alexandre Almeida
dc.contributor.otherDel Savio, Alexandre Almeida
dc.date.accessioned2023-11-24T16:55:59Z
dc.date.available2023-11-24T16:55:59Z
dc.date.issued2023
dc.identifier.citationQuinteros Perez, E. A. N., Inciso Mayoria, V. E. & Del Savio, A. A. (2023). Time Optimization Proposal for the Design and Execution of Plumbing Systems Implementing VDC Methodology: 6-Floor Building Case Study. En A. J. Mertens, and S. Somasundaram (Eds.), International Conference on Future Technologies in Manufacturing, Automation, Design and Energy: 3rd International Conference on Future Technologies in Manufacturing, Automation, Design and Energy, ICOFT MADE 2022 (vol. 130, pp. 183-188. Trans Tech Publications Ltd. https://doi.org/10.4028/p-05RCEkes_PE
dc.identifier.issn1662-8969
dc.identifier.urihttps://hdl.handle.net/20.500.12724/19377
dc.description.abstractIn recent years, the architecture, engineering, and construction industry has been characterized by large losses of resources, time, and costs. One of the main reasons for this problem need for more integration and collaboration between project stakeholders in different areas and specialties. The design, coordination and installation of mechanical, plumbing, electrical (MEP), and fire protection (FP) systems represent one of the main areas of improvement in the construction industry, especially in complex projects. The present research implements the Virtual, Design and Construction (VDC) methodology as an empowering agent in the optimization of time in the design and execution processes of plumbing systems in a 6-floor building of approximately 2,120 square meters in Lima, Peru. Initially, the traditional workflow for designing and executing sanitary systems was mapped. Then, an optimized workflow was developed considering the principles of the VDC methodology. As a result of the optimized workflow, it is possible to foresee a 5% reduction in design time and a 23% reduction in execution time.es_PE
dc.formatapplication/html
dc.language.isoeng
dc.publisherTrans Tech Publications Ltdes_PE
dc.relation.ispartofurn:issn: 1662-8969
dc.relation.ispartofurn:isbn: 978-303640196-6
dc.rightsinfo:eu-repo/semantics/restrictedAccess*
dc.sourceRepositorio Institucional - Ulimaes_PE
dc.sourceUniversidad de Limaes_PE
dc.subjectPendientees_PE
dc.titleTime Optimization Proposal for the Design and Execution of Plumbing Systems Implementing VDC Methodology: 6-Floor Building Case Studyes_PE
dc.typeinfo:eu-repo/semantics/conferenceObject
dc.type.otherArtículo de conferencia en Scopus
dc.publisher.countryCHes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.00es_PE
dc.identifier.doihttps://doi.org/10.4028/p-05RCEk
dc.contributor.studentQuinteros Perez, Estella Arianna Nicole (Ingeniería Civil)
dc.contributor.studentInciso Mayoria, Vanessa Estefania (Ingeniería Civil)
ulima.catOI
ulima.autor.afiliacionDel Savio, Alexandre Almeida (Civil Engineering Department, Universidad de Lima)es_PE
ulima.autor.carreraDel Savio, Alexandre Almeida (Ingeniería Civil)es_PE
dc.identifier.scopusid2-s2.0-85174456932
dc.identifier.eventAdvances in Science and Technology


Ficheros en el ítem

FicherosTamañoFormatoVer

No hay ficheros asociados a este ítem.

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem