Ingeniería Civil
Envíos recientes
-
Improving OEE in a Peruvian SME: A Case Study on the Application of Lean Manufacturing Tools in the Metalworking Sector
(Publish-Ing in cooperation with TIB - Leibniz Information Centre for Science and Technology University Library, 2023)In Peru, SMEs have been affected by the crisis that caused the COVID 19 pandemic. Likewise, the hard competition with Asian countries like China has been a reason for Peruvian SMEs deciding to work with high-quality products. ... -
Time Optimization Proposal for the Design and Execution of Plumbing Systems Implementing VDC Methodology: 6-Floor Building Case Study
(Trans Tech Publications Ltd, 2023)Acceso restringidoIn recent years, the architecture, engineering, and construction industry has been characterized by large losses of resources, time, and costs. One of the main reasons for this problem need for more integration and ... -
Challenges of ISO 19650 Application on Public Health Projects
(Trans Tech Publications Ltd, 2023)Acceso restringidoDespite the benefits of Building Information Modeling (BIM), some challenges to implementing it have appeared due to traditional project management, especially in the construction of complex projects. This article presents ... -
Construction Process Optimization of Concrete Structural Elements Using VDC - Case Study (Building)
(Trans Tech Publications Ltd, 2023)Acceso restringidoThe construction industry is an engine of economic and social development; however, it is one of the industries that has grown the least in terms of productivity. Furthermore, it is characterized by inefficiencies that ... -
VDC in Practice: A Preliminary Categorization of Production Metrics reported in Scandinavia and Latin America
(The International Group for Lean Construction, 2022)Acceso abiertoArchitecture, Engineering and Construction (AEC) teams are increasingly using emerging management methods involving collaboration, lean construction, and digitization for managing projects. Production metrics (PM) are being ... -
Prefabricated Reinforcement in Construction Using VDC: Case Study Ovalo Monitor Bridge
(The International Group for Lean Construction, 2022)Acceso abiertoIn construction projects, there may be rework and delays associated with construction processes with a low level of industrialization, resulting from the lack of constructability of the designs. To promote industrialization ... -
VDC framework proposal for curtain wall construction process optimization
(CRC Press, 2023)Acceso restringidoA building is made up of structural and non-structural elements. Among these are the curtain wall systems. The curtain walls are glazed elements that can cover the building façade entirely and provide thermal and enclosure ... -
Construction process time optimization of a reinforced concrete reaction slab, implementing the VDC methodology
(CRC Press, 2023)Acceso restringidoThe Architecture, Engineering, and Construction (AEC) industry has shown low productivity levels, mainly due to the fragmentation between the agents involved. Given this, the industry is modernizing and implementing ... -
A Comparative Analysis of Production Metrics across VDC Implementations
(American Society of Civil Engineers (ASCE), 2022)Acceso restringidoProduction metrics (PM) are important yardsticks for AEC (Architecture, Engineering, and Construction) teams to determine whether their projects are on track. This paper reports on research that looked for empirical evidence ... -
The use of artificial intelligence to identify objects in a construction site
(Universidad de Lima, 2021)Acceso abiertoThe construction industry invests a large amount of effort and resources in construction processes such as the follow-up, control, and monitoring of construction works, which, compared to other areas, present a low level ... -
Use of the sensors of a latest generation mobile phone for the three-dimensional reconstruction of an archaeological monument: The survey of the Intihuatana stone in Machu Picchu (Peru')
(Institute of Physics Publishing, 2020)Acceso abiertoThe survey of archaeological monuments presents particular needs and difficulties. Such surveys must in fact be as complete, geometrically correct and accurately geo-referenced as possible. These needs, however, often face ...