Envíos recientes

  • Time Optimization Proposal for the Design and Execution of Plumbing Systems Implementing VDC Methodology: 6-Floor Building Case Study 

    Quinteros Perez, Estella Arianna Nicole; Inciso Mayoria, Vanessa Estefania; Del Savio, Alexandre Almeida (Trans Tech Publications Ltd, 2023)
    Acceso restringido
    In recent years, the architecture, engineering, and construction industry has been characterized by large losses of resources, time, and costs. One of the main reasons for this problem need for more integration and ...
  • Challenges of ISO 19650 Application on Public Health Projects 

    Chamochumbi Chvedine, Renzo Antonio; Dulanto Cam, Gianmarco Rodrigo; Salinas Saavedra, José Roberto; Del Savio, Alexandre Almeida (Trans Tech Publications Ltd, 2023)
    Acceso restringido
    Despite the benefits of Building Information Modeling (BIM), some challenges to implementing it have appeared due to traditional project management, especially in the construction of complex projects. This article presents ...
  • Construction Process Optimization of Concrete Structural Elements Using VDC - Case Study (Building) 

    Ruesta Balcazar, Diego; Burga Sandoval, Sebastian Mathias; Del Savio, Alexandre Almeida; Majumdar, Tulika (Trans Tech Publications Ltd, 2023)
    Acceso restringido
    The construction industry is an engine of economic and social development; however, it is one of the industries that has grown the least in terms of productivity. Furthermore, it is characterized by inefficiencies that ...
  • VDC in Practice: A Preliminary Categorization of Production Metrics reported in Scandinavia and Latin America 

    Majumdar, Tulika; Rasmussen, Steinar G.; Del Savio, Alexandre Almeida; Johannesdottír, Katrin; Hjelseth, Eilif; Fischer, Martin A. (The International Group for Lean Construction, 2022)
    Acceso abierto
    Architecture, Engineering and Construction (AEC) teams are increasingly using emerging management methods involving collaboration, lean construction, and digitization for managing projects. Production metrics (PM) are being ...
  • Prefabricated Reinforcement in Construction Using VDC: Case Study Ovalo Monitor Bridge 

    Tuesta Schuler, Rodrigo; Vicuña Jimenez, Mark Anthony; Del Savio, Alexandre Almeida; Palpan, Alejandro; Quiroz, Felipe; Valle, Erika (The International Group for Lean Construction, 2022)
    Acceso abierto
    In construction projects, there may be rework and delays associated with construction processes with a low level of industrialization, resulting from the lack of constructability of the designs. To promote industrialization ...
  • VDC framework proposal for curtain wall construction process optimization 

    Bustamante Portillo, Valeria; Cedron Marin, Juan Pablo; Del Savio, Alexandre Almeida (CRC Press, 2023)
    Acceso restringido
    A building is made up of structural and non-structural elements. Among these are the curtain wall systems. The curtain walls are glazed elements that can cover the building façade entirely and provide thermal and enclosure ...
  • Construction process time optimization of a reinforced concrete reaction slab, implementing the VDC methodology 

    Del Savio, Alexandre Almeida; Borja Bendezu, Mariana Camila; Barcena Serna, Maria Luisa (CRC Press, 2023)
    Acceso restringido
    The Architecture, Engineering, and Construction (AEC) industry has shown low productivity levels, mainly due to the fragmentation between the agents involved. Given this, the industry is modernizing and implementing ...
  • A Comparative Analysis of Production Metrics across VDC Implementations 

    Majumdar, Tulika; Rasmussen, Steinar G.; Del Savio, Alexandre Almeida; Johannesdottir, Katrin; Hjelseth, Eilif; Fischer, Martin (American Society of Civil Engineers (ASCE), 2022)
    Acceso restringido
    Production metrics (PM) are important yardsticks for AEC (Architecture, Engineering, and Construction) teams to determine whether their projects are on track. This paper reports on research that looked for empirical evidence ...
  • The use of artificial intelligence to identify objects in a construction site 

    Del Savio, Alexandre Almeida; Luna, Ana; Cárdenas-Salas, Daniel; Vergara Olivera, Mónica; Urday Ibarra, Gianella (Universidad de Lima, 2021)
    Acceso abierto
    The construction industry invests a large amount of effort and resources in construction processes such as the follow-up, control, and monitoring of construction works, which, compared to other areas, present a low level ...
  • Use of the sensors of a latest generation mobile phone for the three-dimensional reconstruction of an archaeological monument: The survey of the Intihuatana stone in Machu Picchu (Peru') 

    Baiocchi, Valaerio; Del Pizzo, Silvio; Pugliano, Giovanni; Onori, Matteo; Robustelli, Umberto; Troisi, Salvatore; Vatore, Felicia; León Trujillo, Francisco James (Institute of Physics Publishing, 2020)
    Acceso abierto
    The survey of archaeological monuments presents particular needs and difficulties. Such surveys must in fact be as complete, geometrically correct and accurately geo-referenced as possible. These needs, however, often face ...