Construction process time optimization of a reinforced concrete reaction slab, implementing the VDC methodology
![Thumbnail](/bitstream/handle/20.500.12724/19824/Tesis_Resumen.pdf.jpg?sequence=7&isAllowed=y)
View/ Open
Tesis_Resumen
(application/pdf: 110.7Kb)
(application/pdf: 110.7Kb)
Tesis
(application/pdf: 957.0Kb)
(application/pdf: 957.0Kb)
Autorización
(application/pdf: 113.1Kb)
(application/pdf: 113.1Kb)
Reporte de similitud
(application/pdf: 3.549Mb)
(application/pdf: 3.549Mb)
Date
2023Advisor(s)
Metadata
Show full item recordAbstract
The Architecture, Engineering, and Construction (AEC) industry has shown low productivity levels, mainly due to the fragmentation between the agents involved. Given this, the industry is modernizing and implement-ing collaborative methodologies to improve the development of projects. One of them is the VDC (Virtual Design and Construction) methodology. VDC allows us to improve design, construction, operation, and maintenance management, changing paradigms within traditional processes. This research shows how imple-menting VDC can help to optimize the construction process time of a reinforced concrete reaction slab in a civil engineering laboratory. As a main result, an optimized process was developed, generating a 44-day reduc-tion in the construction time of the reaction slab.
How to cite
Borja Bendezu, M. C. & Barcena Serna, M. L. (2023). Construction process time optimization of a reinforced concrete reaction slab, implementing the VDC methodology [Tesis para optar el Título Profesional de Ingeniero Civil, Universidad de Lima]. Repositorio Institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/19824Publisher
Universidad de LimaCategory / Subcategory
Ingeniería civil / Construcción y estructurasSubject
Collections
- Tesis [12]