Mostrar el registro sencillo del ítem

dc.contributor.authorÁlvarez Calleja, Gilda Nicida
dc.contributor.authorChávez Ugaz, Rafael
dc.contributor.authorDiez Canseco Rizo Patrón, Joaquín
dc.contributor.otherChávez Ugaz, Rafael
dc.date.accessioned2024-02-21T17:01:16Z
dc.date.available2024-02-21T17:01:16Z
dc.date.issued2023
dc.identifier.citationÁlvarez Calleja, G. N., Chávez Ugaz, R., & Diez Canseco Rizo Patrón, J. (2023). Logistic process improvement of applying SLP, 5S, and Slotting in the main warehouse of a hydroelectric power plant. Congreso Internacional de Innovación y Tendencias en Ingeniería CONIITI 2023, Bogotá, Colombia, Octubre 2023.https://doi.org/10.1109/CONIITI61170.2023.10324299es_PE
dc.identifier.urihttps://hdl.handle.net/20.500.12724/19919
dc.description.abstractThis article focuses on improving the logistic process in the main warehouse of a hydroelectric power plant by applying three methodologies in a case study: SLP, 5S, and Slotting. SLP is used to design an optimal warehouse, considering factors such as picking speed and organization. The 5S methodology is applied to increase the utility of the warehouse by improving efficiency and reducing product search time. Lastly, the Slotting method is used to enhance warehouse management by optimizing product placement and reducing picking time. A diagnostic of the case study was conducted, analyzing variables and root causes. Subsequently, the methodologies were implemented, and the results were evaluated. The results showed a significant improvement in warehouse efficiency and productivity. Product search time was reduced, organization was improved, and product placement was optimized, reducing the space used by 26%. Additionally, picking time was reduced by 40%, and warehouse management was enhanced. In summary, this article demonstrates the importance of applying methodologies such as SLP, 5S, and Slotting to improve efficiency and productivity in warehouse management. These methodologies can be applied in different industries or similar sectors to optimize logistic processes and enhance the profitability of companies.es_PE
dc.formatapplication/html
dc.language.isoeng
dc.publisherIEEEes_PE
dc.relation.ispartofurn:isbn: 979-835036946-5
dc.rightsinfo:eu-repo/semantics/restrictedAccess*
dc.sourceRepositorio Institucional Ulimaes_PE
dc.sourceUniversidad de Limaes_PE
dc.subjectPendiente
dc.titleLogistic process improvement of applying SLP, 5S, and Slotting in the main warehouse of a hydroelectric power plant
dc.typeinfo:eu-repo/semantics/conferenceObject
dc.type.otherArtículo de conferencia en Scopus
dc.publisher.countryUSes_PE
dc.subject.ocdePendiente
dc.identifier.doihttps://doi.org/10.1109/CONIITI61170.2023.10324299
dc.contributor.studentÁlvarez Calleja, Gilda Nicida (Ingeniería Industrial)
dc.contributor.studentDiez Canseco Rizo Patrón, Joaquín (Ingeniería Industrial)
ulima.catOI
ulima.autor.afiliacionFacultad de Ingeniería, Universidad de Limaes_PE
ulima.autor.carreraIngeniería Industriales_PE
dc.identifier.scopusid2-s2.0-85179552541
dc.identifier.event9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedings


Ficheros en el ítem

FicherosTamañoFormatoVer

No hay ficheros asociados a este ítem.

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem