Production model integrating toc and lean for lead time reduction in chemical manufacturing: an empirical research in Peru
Ver/
Tesis
(application/pdf: 395.8Kb)
(application/pdf: 395.8Kb)
Autorización
(application/pdf: 238.3Kb)
(application/pdf: 238.3Kb)
Reporte de similitud
(application/pdf: 1.533Mb)
(application/pdf: 1.533Mb)
Fecha
2024Asesor(es)
Metadatos
Mostrar el registro completo del ítemResumen
La industria química permite la creación de una amplia gama de productos como es el caso de los polímeros, emulsiones, entre otros. En el mundo dicho sector genera $5.7 billones del PBI mundial, y en el Perú este mismo representa el 1% del PBI nacional. El presente artículo describe la implementación de un sistema integrado de la Teoría de Restricciones (TOC) y Lean Manufacturing (5s y SMED) para la reducción del Lead time del proceso de producción de la resina RA-401, para ello se analiza el problema general a través de la herramienta VSM, donde se evidencian las causas raíz, el tiempo de cada actividad y la incidencia del trabajador. Después de la implementación del modelo que se desarrolló a través de un programa de software llamado Arena, se redujo el Lead Time de Procesamiento en 7.88%, el Tiempo de Ciclo en 7.94% y se aumentó la productividad en 8.48%. The chemical industry allows the creation of a wide range of products such as polymers, emulsions, among others. In the world, this sector generates $5.7 billion of the world’s Gross Domestic Product (GDP), and in Peru it represents 1% of the national GDP. This article describes the implementation of an integrated system containing the Theory of Constraints (TOC) and Lean Manufacturing (5s and Single Minute Exchange of Die) for the reduction of the lead time in the production process of the RA-401 resin in a chemical SME in Peru. The general problem is analyzed through the Value Stream Mapping tool, where the root causes, the time of each activity, and the incidence of the worker are evidenced. The validation of the developed model was carried out in the stage of filling and labeling of 200 kg resin cylinders through Arena Simulator. The results showed that the processing lead time was reduced by 7.88%, cycle time by 7.94% and productivity was increased by 8.48%.
Cómo citar
Lopez Osorio, A. T., & Vila Moretti, N. F. (2024). Production model integrating toc and lean for lead time reduction in chemical manufacturing: an empirical research in Peru [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio Institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/21473Editor
Universidad de LimaColeccion(es)
- Tesis [905]