Show simple item record

dc.contributor.advisorQuiroz Flores, Juan Carlos
dc.contributor.authorAbad Mendoza, Jorge Sebastian
dc.contributor.authorPalga Condori, Miguel Angel
dc.date.accessioned2025-11-18T21:44:56Z
dc.date.available2025-11-18T21:44:56Z
dc.date.issued2025
dc.identifier.urihttps://hdl.handle.net/20.500.12724/23531
dc.description.abstractThe plastics industry has grown in recent years due to growing demand in sectors such as construction and transportation, contributing 4% of the industrial GDP and employing more than 200,000 workers in the country. However, it has been identified that companies in the sector operate with low availability (70.83%) due to various production problems, including hours lost due to lack of machine maintenance. On the other hand, because of these problems, demand exceeds supply due to the low availability of the companies in the plastics sector. The literature review suggests that Lean Manufacturing (SMED, Standardization of Work, 5S) and the TPM (Total Productive Maintenance) technique are necessary tools to solve these problems. Finally, the implementation of these tools will allow solving the mentioned problems by increasing availability by 90%.en_EN
dc.description.abstractLa industria del plástico ha crecido en los últimos años debido a la creciente demanda en sectores como la construcción y el transporte, contribuyendo con un 4% al PIB industrial y empleando a más de 200,000 trabajadores en el país. Sin embargo, se ha identificado que las empresas del sector operan con una baja disponibilidad (70.83%) debido a diversos problemas de producción, incluyendo la pérdida de horas por falta de mantenimiento en las máquinas. Por otro lado, como consecuencia de estos problemas, la demanda supera la oferta debido a la baja disponibilidad de las empresas del sector plástico. La revisión de la literatura sugiere que Lean Manufacturing (SMED, estandarización del trabajo, 5S) y la técnica TPM (Mantenimiento Productivo Total) son herramientas clave para solucionar estos problemas. Finalmente, la implementación de estas herramientas permitirá resolver las dificultades mencionadas, aumentando la disponibilidad al 90%.es_PE
dc.formatapplication/pdf
dc.language.isoeng
dc.publisherUniversidad de Lima
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/4.0/*
dc.subjectPendientees_PE
dc.titleMaintenance model based on lean and TPM to increase machine availability in an SME in the plastic sectoren_EN
dc.typeinfo:eu-repo/semantics/bachelorThesis
thesis.degree.levelTitulo profesional
thesis.degree.disciplineIngeniería Industrial
thesis.degree.grantorUniversidad de Lima. Facultad de Ingeniería
dc.publisher.countryPE
dc.type.otherTesis
thesis.degree.nameIngeniero Industrial
renati.advisor.orcidhttps://orcid.org/0000-0003-1858-4123
renati.discipline722026
dc.identifier.isni0000000121541816
renati.author.dni73044428
renati.author.dni70085297
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesional
renati.advisor.dni10300285
renati.jurorSalazar Medina, Nicolás Francisco
renati.jurorTupia De La Cruz, Elmer Luis
renati.jurorQuiroz Flores, Juan Carlos
renati.typehttps://purl.org/pe-repo/renati/type#tesis
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04
ulima.catOI


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

info:eu-repo/semantics/openAccess
Except where otherwise noted, this item's license is described as info:eu-repo/semantics/openAccess